
4.1 Precautions for maintenance and inspection work
4-3
4. Maintenan
ce and Inspection
4.2 Inspection Items and Schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often as needed.
Table type
*Stainless steel sheet life guideline: 5,000km
Inspection period
External
inspection
Internal
inspection
Greasing
Start of work inspection
○
-
-
1-month inspection
○
-
-
3-month inspection
-
-
○
3-month inspection on
-
-
Grease supply timing
(Guideline) dependent
6-month inspection
○
○
Every 6 months thereafter
○
○
Grease supply timing (Guideline)
Maximum operating speed [mm/s]
Grease supply timing (Guideline)
Operation distance
Months
0 to 750 or less
1,250km
12 months
750 to 1300
5,000km
Содержание ROBO Cylinder RCS4-TA4C
Страница 2: ......
Страница 18: ...Names of the Parts Intro 12 ...
Страница 68: ...1 49 1 Specifications ...
Страница 91: ...Connecting with the Controller 3 1 Connecting with the Controller 3 1 ROBO Cylinder Chapter ...
Страница 134: ...5 13 5 External Dimensions ...
Страница 135: ...Life 6 1 Concept of life 6 1 ROBO Cylinder Chapter ...
Страница 140: ...7 3 7 Warranty ...
Страница 141: ...Appendix 8 1 Index 8 1 8 2 Revision history 8 3 ROBO Cylinder Chapter ...
Страница 143: ...8 1 Index 8 2 8 Appendix W Warranty 7 1 to 2 With brake Model Code B 1 45 ...
Страница 145: ......