R290LC-9 FC
24
3. Preparations Before Maintenance
Before starting maintenance work described in this Manual, stop the equipment as below for
maintenance unless described otherwise.
- Place the equipment on a safe and flat place.
- Attach a “Do not start” tag to the work lever.
- Wear appropriate protective clothing when working on a dangerous task.
Wear safety helmet, safety shoes, protective glasses, tight work trousers, ear protection,
industrial gloves and breathing mask.
4. Periodic Inspection of Important Parts
Periodic inspection must be conducted to secure safety during work and operation.
Inspection Points
1. Injection of grease into each part
2. Deformation, damaging and abnormal noise of each part
3. Loosening, loss and falling of bolts, nuts and stoppers
4. Abrasion and damaging of pin, bush and pad
5. Operating status and oil leakage of hydraulic valve
6. Oil leakage of hydraulic cylinder and deformation and damaging of rod
7. Deformation of wood grapple structure
8. Abrasion and damaging of grappler of wood grapple
Содержание R290LC-9 FC
Страница 12: ...R290LC 9 FC 12 Specifications 1 Name of Each Part Forest Equipment R290LC 9 FC ...
Страница 13: ...R290LC 9 FC 13 Wood Grapple ...
Страница 14: ...R290LC 9 FC 14 2 Forest Equipment Work Scope Diagram Standard Boom_R290LC 9 FC ...
Страница 17: ...R290LC 9 FC 17 4 Hydraulic Circuit Diagram Hydraulic Circuit Diagram ...
Страница 22: ...R290LC 9 FC 22 2 Operation of Lever and Pedal ...
Страница 28: ...G010b 3 4 5 1 ...
Страница 30: ...G010c 3 4 5 2020 5 31 REV 20E ...
Страница 32: ...G010d 3 4 5 2020 5 31 REV 20E 10 11 ...
Страница 34: ...G010h 3 4 8 4 4 ...
Страница 36: ...8 G050 3 1 2 9 10 11 10 12 12 11 14 ...
Страница 38: ...H010 1 2 3 4 5 ...