8
meters. Our company shall not take any responsibility if there were any
consequece caused by operations now following the above rules.
3.3 Check after Installation
After the whole installation process, the host can be powered on. The proper
functioning of the host can be checked by watching the status of the LED light on the
front panel. The power indicator will be constantly red, and the operation indicator will
be green and flickering if the host functions properly. Besides, the operation status of
the host can be checked through palm microphone.