background image

www.hysecurity.com  © 2013    

SwingSmart DC Quick Start Steps 

D0324 Rev D 

    Page 5  

C

OmPlete

 g

ate

 a

rm

 i

nStallatiOn

WARNING

It is critical that you install the 

elbow joint covers to comply 

with UL 325 Safety Standards. The elbow 

joint is considered a pinch point and serious 

injury may occur if the covers are not secured 

properly to the gate arms.

Cover 

fastener

Top 

cover

Bottom 

cover

Cover 

fastener

C

ut

 & C

Over

 

the

 e

lbOW

 j

Oint

To accommodate the covers, saw off the excess 
on the over-extension stop. 
Align the top and bottom covers and insert the 
two fasteners.

NOTE:

  The gap between the two covers should 

be less than ¼-inch (6mm).

Over-extension stop

d

rill

 & b

Olt

 [2

x

]

Drill holes with a 17/64-inch bit and  
connect arms with the supplied  
¼ x 20 UNC bolts, washers, and lock nuts.

Or

 W

eld

 [2

x

]

¼-inch (3mm) fillet.

S

et

 

the

 t

aPer

 C

lamP

The taper clamp is designed to break free when a gate 
strike occurs,  but not slip during normal operations. Set 
it properly, by taking the  following steps:

 

Š

Loosen the taper clamp so you can manually swing 

the gate half way between the open and close 

position (above a 45° angle).

 

Š

Move the taper handle clockwise in ¼ turn increments 

until the gate cannot be pushed manually.

 

Š

Continue to incrementally turn the taper handle until 

the clamp is set so that it only breaks free with a 

strong push that simulates a gate strike.

 

Š

NOTE:

  A large amount of torque is not required to 

obtain a tight clamp setting. At highly secure facilities, 

to reduce the chance of someone manually forcing 

the gate open, remove the set screw from the elbow 

joint and straighten the arm. Straightening the arm is 

preferable to over-tightening the taper clamp.

45° 

 

a

djuSt

 

and

 t

eSt

 g

ate

 O

PeratiOn

Taper 

handle

Loosen

Tighten

Содержание SwingSmart DC

Страница 1: ...Unpack the Operator Quick Start Steps Rear Cover Front Cover Latch Latch ...

Страница 2: ...ons and comply with all local government regulations and codes Concrete Pad Dimensions Operator Placement Conduit Placement Conduit runs 4 10cm above grade level WARNING Potential entrapment area Minimum 16 41cm clearance required If less than 16 41cm install a photo eye or edge sensor Pad height is 2 5cm above grade level Vehicle loop control wires Extra conduit Dual Sequenced gate Low voltage Co...

Страница 3: ...tronic controls Operator Placement Gate Arm Geometry for 90 Gate Opening Short Gate Installation For gates up to 10 feet 3 meters Long Gate Installation For gates up to 20 feet 6 meters X Y Xg A B X Y Xg A B 10 5 27cm 14 36cm 23 5 60cm 15 5 39cm 21 5 55cm 15 38cm 30 76cm 44 112cm 28 71cm 38 5 98cm 18 46cm 27 5 70cm 17 5 44cm 24 5 62cm 35 89cm 49 124cm 30 5 78cm 42 5 108cm 20 51cm 29 5 75cm 19 48cm...

Страница 4: ...base of operator Set screw used to prevent locking of the elbow joint CAUTION Use the supplied set screw to prevent the arm from locking The intent of the offset is that upon gate strike the elbow will bend and the taper clamp will slip minimizing damage to the gearbox and operator Adjust the Limit Switches Extend the taper handle and loosen the taper clamp Manually swing the gate to full OPEN and...

Страница 5: ...s and lock nuts or Weld 2x inch 3mm fillet Set the Taper Clamp The taper clamp is designed to break free when a gate strike occurs but not slip during normal operations Set it properly by taking the following steps Loosen the taper clamp so you can manually swing the gate half way between the open and close position above a 45 angle Move the taper handle clockwise in turn increments until the gate...

Страница 6: ...res with wire nuts CAUTION Wiring of gate operators must conform to NEC standards and comply with all local codes Junction box Turn Power OFF DANGER Turn OFF AC power at the source circuit breaker panel before accessing the wires in the SwingSmart junction box Make sure both the DC and AC power switches are in the OFF position CAUTION When connecting to 208 230VAC on the AC power the voltage selec...

Страница 7: ... www hysecurity com 2013 SwingSmart DC Quick Start Steps D0324 Rev D Page 7 Connect Accessories All the accessories require a minimum of two connections on the Smart DC Controller a device input a Common Bus Terminal COM Other devices may require more connections or configurations For example the Fire Department EMERG OPEN input requires a 24 volt input The connection must be activated by changing...

Страница 8: ...s accessibility Turn ON power at the main circuit breaker and toggle both power switches ON SELECTIONS 0 No handing set Gate will not move until handing is set Looking at the gate from the secure operator side choose R If the operator is on your right L If the operator is on your left SELECTIONS 0 Not set 1 Gate weight 0 to 300lbs 0 to 136kg 2 Gate weight 301 to 600lbs 136 to 272kg 3 Gate weight 6...

Отзывы: