MS500EL
Operation
Operator Manual
© 2022
Hyosung TNS.
All rights reserved.
52
Case 7: Remove Jam from Center Transport Path (Lower) of Lower Unit
1. In case of the Draw Section, turn the Knob A counterclockwise and remove the jammed bill.
Case 8: Remove Jam from Center Transport Path (Upper) of Lower Unit
1. In case of the Center Transport Path (Upper), turn the Knob B counterclockwise and remove the
jammed bill.
Содержание TNS MS500EL
Страница 1: ...MS500EL Operator Manual V01 00 00...