background image

Maximum Capacity of Pipe in Cubic Feet of Natural Gas per Hour for Gas Pressures of

0.5 Psig or Less and a Pressure Drop of 0.3 Inch Water Column

(Based on a 0.60 Specific Gravity Gas)

Nominal

Iron Pipe

Size,

Inches

Internal

Diameter,

Inches

Length of Pipe, Feet

10

32
72

132
278
520

1,050
1,600
3,050
4,800
8,500

17,500

20

22
49
92

190
350
730

1,100
2,100
3,300
5,900

12,000

30

18
40
73

152
285
590
890

1,650
2,700
4,700
9,700

40

15
34
63

130
245
500
760

1,450
2,300
4,100
8,300

50

14
30
56

115
215
440
670

1,270
2,000
3,600
7,400

60

12
27
50

105
195
400
600

1,150
1,850
3,250
6,800

70

11
25
46
96

180
370
560

1,500
1,700
3,000
6,200

80

11
23
43
90

170
350
530
990

1,600
2,800
5,800

90

10
22
40
84

160
320
490
930

1,500
2,600
5,400

100

9

21
38
79

150
305
460
870

1,400
2,500
5,100

125

8

18
34
72

130
275
410
780

1,250
2,200
4,500

150

8

17
31
64

120
250
380
710

1,130
2,000
4,100

175

7

15
28
59

110
225
350
650

1,050
1,850
3,800

200

6

14
26
55

100
210
320
610
980

1,700
3,500

1/4"
3/8"
1/2"
3/4"

1"
1-1/4"
1-1/2"
2"
2-1/2"
3"
4"

.326
.493
.622
.824

1.049
1.380
1.610
2.067
2.469
3.026
4.026

Maximum Capacity of Pipe in Thousands of Btu per Hour of Undiluted Liquified

Petroleum Gases (at 11 Inches Water Column Inlet Pressure)

(Based on a Pressure Drop of 0.5 Inch Water Column)

Nominal

Iron Pipe

Size,

Inches

Length of Pipe, Feet

10

275
567

1071
2205
3307
6221

20

189
393
732

1496
2299
4331

30

152
315
590

1212
1858
3465

40

129
267
504

1039
1559
2992

50

114
237
448
937

1417
2646

60

103
217
409
834

1275
2394

70

96

196
378
771

1180
2205

80

89

185
346
724

1086
2047

90

83

173
322
677

1023
1921

100

78

162
307
630
967

1811

125

69

146
275
567
866

1606

150

63

132
252
511
787

1498

1/2"
3/4"

1"
1-1/4"
1-1/2"
2"

2. Determine total equivalent length of gas main. Re-
member, if exact number/type of fittings are not known,
for initial determination only, add 20% for fittings to the
straight length of piping to get a total equivalent length.

3. In Figure B3, find appropriate pipe length in upper por-
tion of table under "Length of Pipe, Feet" heading.

4. Move down the column; match the cubic feet per hour
(from Step 1). Higher capacity selection is acceptable.

5. Move across to the left-hand column "Nominal Iron
Pipe Size, Inches" and read required pipe size.

6. Once a diameter has been selected, verify the total
equivalent length.

Gas Headers (Propane)
1. Determine Btuh input for each bank of modules.

2. Determine the length of the header, which is typically
dependent on the length of the bank of modules which it
serves (see Figure B2). In most cases, the header is
straight pipe only.

3. In Figure B4, find appropriate pipe length in upper por-
tion of table under "Length of Pipe, Feet" heading.

4. Move down the column; match the Btuh input (from
Step 1). Higher capacity selection is acceptable.

5. Move across to the left-hand column "Nominal Iron
Pipe Size, Inches" and read required pipe size.

Gas Main (Propane)
1. Determine Btuh input for the total heating plant.

2. Determine total equivalent length of gas main. Re-
member, if exact number/type of fittings are not known,
for initial determination only, add 20% for fittings to the
straight length of piping to get a total equivalent length.

3. In Figure B4, find appropriate pipe length in upper por-
tion of table under "Length of Pipe, Feet" heading.

4. Move down the column; match the Btuh input (from
Step 1). Higher capacity selection is acceptable.

5. Move across to the left-hand column "Nominal Iron
Pipe Size, Inches" and read required pipe size.

6. Once a diameter has been selected, verify the total
equivalent length.

FIGURE B3

FIGURE B4

25

Содержание MultiTemp MR Series

Страница 1: ...p 2 Arranging Heating Plant 5 Step 3 Setting Aligning Modules 5 SECTION 3 INSTALLING WATER PIPING Step 1 Planning Ahead 6 Step 2 MC Heat Exchangers 6 Step 3 Supply Return Headers 6 Step 4 Hydronic Com...

Страница 2: ...sence of such requirements with the National Electrical Code NFPA 70 latest edition UL listed power limited circuit cable is almost universally approved for safety controls on heat ing equipment eithe...

Страница 3: ...0V 60Hz Side 2 amps 24V 60Hz Side 1 0 amps Working Pressure 100 psi ASME Transformer Ratings MR MR P 120V 60Hz Side 3 amps 24V 60Hz Side 1 5 amps MR PV 9 1 2 9 1 2 13 SUPPLY CONNECTIONS FOR MR 360C 42...

Страница 4: ...6 4 HOLLOW CLAY TILE TWO COURSES OPENINGS THRU BLOCKS IN TOP COURSE TO BE AT 90 ANGLE TO OPENINGS THRU BOTTOM COURSE 0 22 GAUGE SHEET METAL FLOOR 6 OVERHANG OF BLOCK AND SHEET METAL ALL AROUND SECTION...

Страница 5: ...bustibles allow for servicing system installation connections 4 Make sure that any connecting breeching runs will not oppose or face each other but rather mix together in the same general direction sp...

Страница 6: ...e anti freeze protection solution no an automotive type anti freeze as dam age to modules and other system components may result WATER TREATMENT A local water treatment company should be consulted t d...

Страница 7: ...LL AFTER ASSEMBLING JACKET DRAIN VALVES One supplied for each module Install below return connection PRESSURE REDUCING FILL VALVE Follow manu facturer s installation instructions AIR SEPARATOR 1 Locat...

Страница 8: ...p or zone from the main system Follow manufacturer s instal lation instructions MAKE UP WATER METER Optional Will help deter mine total system water volume for purposes of water treatment and aid in t...

Страница 9: ...COIL COLD WATER TERMINAL IN THE COLD WATER LINE BEFORE ENTERING THE COIL To Potable Water System City Water Supply MIXING VALVE LOW WATER CUTOFF HEAT EXCHANGER MOTORIZED VALVE Service Hot Water Supply...

Страница 10: ...TER CUTOFF MANUAL RESET HI LIMIT EXPANSION TANK NOTE VALVES H OPENED ON HEATING WITH C VALVES CLOSED REVERSE PROCEDURE ON COOLING EXP TANK VENT ROOM UNIT DRAIN CHILLER BOILER H C PUMP RELIEF VALVE FIL...

Страница 11: ...SHEET METAL GAUGE FOR ROUND AND RECTANGULAR BREECHING SHEET METAL GAUGE 24 22 20 16 DIAMETER IN INCHES 6 TO 10 10 TO 12 14 TO 16 OVER 16 ROUND GREATER DIMENSION IN INCHES 10 TO 13 14 TO 18 19 TO 20 O...

Страница 12: ...FT HOOD PLUG INTO MOLEX RECEPTACLE ON FRONT OF BOILER PLUG INTO MOLEX RECEPTACLE INSIDE DAMPER MOTOR VENT DAMPER WIRE HARNESS TOP VIEW ATTACH LOWER PORTION OF VENT DAMPER TO DRAFTHOOD WITH 1 2 OR SHOR...

Страница 13: ...uld connect to the breeching with a straight 90 connection For improved flue gas flow vent connectors may be installed with a 45 rounded type elbow angled toward the chimney as shown on the far right...

Страница 14: ...or rectangular breeching the larger di mension of the rectangle must be in the vertical position 4 ALL BREECHING RUNS MUST BE PITCHED 1 4 PER FOOT OF LENGTH UPWARDS TOWARD THE CHIMNEY 5 Where one bree...

Страница 15: ...de panel in between jacket sets Fasten front and rear panels to remaining side panel s with screws provided When assembling the jacket overlap bends as shown 3 Install top panels starting with left to...

Страница 16: ...use sizing guidelines rec ommended in Appendix B at the rear of this manual 2 Gas main from meter to gas headers must have a non restrictive lubricated plug valve installed close to the modules as wel...

Страница 17: ...ally without protection of conduits or raceway For Canada installations must be in accordance with Standard C S A C22 1 Canadian Electrical Code Part 1 and Part 2 and or local codes Safety devices suc...

Страница 18: ...18 FIGURE 7 3 WIRING DIAGRAM OPERATION SEQUENCE FOR BOILERS EQUIPPED WITH INTERMITTENT PILOT VENT DAMPER FIGURE 7 2 WIRING DIAGRAM OPERATION SEQUENCE FOR BOILERS EQUIPPED WITH INTERMITTENT PILOT...

Страница 19: ...n each module s gas valve 7 Set operating control s to call for heat Follow direc tions in lighting instruction labels on front of module jack ets and light the boiler modules 8 Allow system water tem...

Страница 20: ...nal manifold pressure setting vary more than 3 W C from factory set pressures If rated input cannot be obtained with regulator adjustment gas supply pres sure or orifice size may be the cause Consult...

Страница 21: ...U CU FT 0 60 SG L P GAS 2500 BTU CU FT 1 5 SG TYPE OF GAS 3 5 10 0 R 180 MOD 37 52 R 210 MOD 33 51 R 250 MOD 33 51 R 300 MOD 31 49 FIGURE 8 3 ORIFICE DRILL SIZE 1 Shut off power supply and gas supply...

Страница 22: ...required length is equal to or less than maximum length application is O K If required length exceeds maximum length then you would have to consider ap propriately dividing the heating plant or bank...

Страница 23: ...ther important factor is draft loss equipment and breeching must be located as close as possible to the chimney to minimize draft loss Equipment located further away from the chimney will have greater...

Страница 24: ...ficient for your application situation then you can easily calcu late the gas pipe diameter You need to know 1 Total Btuh input of all modules in the heating plant 2 Heating value Btu per cubic foot o...

Страница 25: ...8 1 2 3 4 1 1 1 4 1 1 2 2 2 Determine total equivalent length of gas main Re member if exact number type of fittings are not known for initial determination only add 20 for fittings to the straight le...

Страница 26: ...lated supply temperatures Level III control system includes the Model S step control and an outdoor thermostat As outdoor temperature drops below a present point the Model S step control is ener gized...

Страница 27: ...uid filled bulb and comes with sunshield for mounting on a north wall where sun s effects are minimized control box can be mounted anywhere within the length of the capillary tube System J The basic c...

Страница 28: ...24V TRANSFORMER LOW WATER CUTOFF GAS VALVE N 4 3 2 1 SUPPLY MANUAL RESET HI LIMIT TO CONTROL PANEL SUPPLY WATER TEMP SENSOR NOTE CONTROLS THERMOSTATS LOW WATER CUT OFFS AQUASTATS ARE RATED AT 8 AMP 1...

Страница 29: ...WHEN CIRCUIT POWER EXCEEDS THIS CONTACTORS MUST BE USED 24V TRANSFORMER MUST HAVE 60VA MINIMUM RATING OUTDOOR TEMP SENSOR FIGURE C5 EXAMPLE OF LEVEL I CONTROL FOR COMBINATION SPACE SERVICE WATER HEAT...

Страница 30: ...LY WATER TEMP SENSOR N H3A 2 1 2 1 NO NC COM 3 2 MOTOR VALVE 115 24V TRANSFORMER N H2A 115 24V TRANSFORMER GATE VALVE 2 H2A N NO C IN COM COM 24 VAC AA HEAT STARTER 240 VAC COM 120 VAC Y TRANSFORMER A...

Страница 31: ...TEM RETURNS TO STANDBY WITH DAMPER CLOSED 42 5727 Rev 3 APPENDIX D FIELD INSTALLATION OF VENT DAMPER ON MR BOILER WITH STANDING PILOT USING KIT BM 9168 31 1 Install vent damper per page 12 2 To wire t...

Страница 32: ...ated BM 3335 1 1 1 1 11 Base Door Insulated BM 3336 1 1 1 1 12 Bracket Manifold L H 55 1606 1 1 1 1 13 Bracket Manifold R H 55 1607 1 1 1 1 14 Bracket Burner 55 1030 1 1 Bracket Burner 55 1031 1 1 15...

Страница 33: ...Indicator For 50 R V 20 1003 1 1 1 1 Temp Press Indicator For 75 100 R V 20 1011 1 1 1 1 29 Grid Ass y BM 9614 1 Grid Ass y BM 9615 1 Grid Ass y BM 9616 1 Grid 03 2206 1 1 30 Dome 7 01 2104 1 1 Dome...

Страница 34: ......

Страница 35: ...1 Stiffening Channel 03 1060 7S 2 03 1060 7S 3 ADDITIONAL COMPONENTS FOR VENT DAMPER For use with Intermittent Pilot Only REF NUMBER REQUIRED PER BOILER NO NAME OF PART PART NO R 180C R 210C R 250C R...

Страница 36: ...260 NORTH ELM ST WESTFIELD MA 01085 413 564 5515 FAX 413 568 9613 5211 CREEKBANK ROAD MISSISSAUGA ONTARIO L4W 1R3 905 625 2991 FAX 905 625 6610...

Отзывы: