6
hosereel 7 User manUal 2014-11-13
5. starting - up
5.1 Preliminary steps
Important!
It is essential to determine size measurements and placement in advance in order
to ensure safe placement, running and emergency actions within the surrounding
environment. these conditions should be respected beginning with the prelimi-
nary stages, before cutting begins.
• Place the machine on a steady and flat foundation.
• Check that all screws is tightened.
• Check that the reel can rotate freely.
5.2 operator position
the placement of the in relation to the operator´s position must make it possible
to observe the result of the operation and maintain safety conditions.
6. Maintenance
check the bearing holders for axle to the basket. the bearings must be lubricated
every hundred running hour with regular bearing grease.
Содержание HoseReel 7
Страница 1: ...MAnUAL en 2014 11 13 HoseReel 7 ...