START-UP REPORT

cut along dotted line

Distributor:__________________________________________________ Order No.: _________________________
Installing Contractor: _________________________________________ Phone: ____________________________
Sales Contact: ______________________________________________ Phone: ____________________________
Customer: ______________________________________________________________________________________
Location: _______________________________________________________________________________________

1. SYSTEM INFORMATION
Size of Wet Well:_______________________________________Manufacturer: _____________________________
Discharge from Bottom of Basin: ________________________Discharge Location:________________________
Inlet from Bottom of Basin: _____________________________Inlet Location: _____________________________
Type of Check Valves: __________________________________Type of Piping: ____________________________
Does System Have Suction Gauges?   

 Yes   

 No        

Suction Pressure Reading: __________________

Does System Have Discharge Gauges?   

 Yes   

 No    

Discharge Pressure Reading:________________

Liquid Being Pumped:_______________________Temperature (F°): __________ Pct. of Solid (%):___________
Is a Sketch or Photograph of System Available?   

 Yes   

 No    If So, Please Attach.

Any Additional Comments on System:______________________________________________________________

_______________________________________________________________________________________________

2. ELECTRICAL INFORMATION
Control Panel Part Number: _____________________________Panel Rated Amps: ________________________
Manufacturer: _________________________________________Voltage: _______________ Phase: ____________
Heater Size:___________________________________________Location of Panel to Wet Well: _______________
Incoming Line Voltage: _________________________________Actual? ___________________________________
Voltage to Pumps: _____________________________________Actual? ___________________________________
Type of Junction Box: __________________________________Manufacturer of Junction Box: ______________
Are Floats Installed in Wet Well?   

 Yes   

 No       Are Floats Set to Engineer’s Specs?   

 Yes   

 No   

Are Floats Wired for Proper Sequencing?   

 Yes   

 No       Are Heat Sensors Hooked Up?   

 Yes   

 No   

Is the Seal Leak Detection Hooked Up?   

 Yes   

 No   

Any Additional Comments on Electrical: ____________________________________________________________

_______________________________________________________________________________________________

3. PUMP INFORMATION
Type of Pump:_________________________________________Serial Number of Pump: ____________________
Voltage of Pump: ________________ Phase: _______________RPM: _________________ Amps: ____________
Impeller Size:____________________ C.O.S. TDH: __________GPM: _________________
Voltage Supplied from Panel:____________________________Actual?___________________________________
Actual Amperage (All Phases):  Phase 1 Amps: ________ Phase 2 Amps: ________ Phase 3 Amps: ________
Define the Rotation of the Pump:   

 Clockwise   

 Counterclockwise

Method Used to Check Rotation:   

 Viewed from the Top   

 Viewed from the Bottom

Any Additional Comments on Pumps: ______________________________________________________________

_______________________________________________________________________________________________

4. ACKNOWLEDGE
Acknowledge that all information is accurate and proper procedures have been followed.
Customer: ___________________________________________________________________ Date: _____________
Start-up Technician:___________________________________________________________ Date: _____________

Send to Warranty Manager, 1101 Myers Parkway, Ashland, OH 44805

 

or Fax to 419-207-3344

 

or email to [email protected] 

 

or submit online at http://forms.pentairliterature.com/startupform/startupform.asp?type=h

Содержание S4HVX Series

Страница 1: ... D FM 06 10 Item E 03 477 Part 5625 477 1 NOTE To the installer Please make sure you provide this manual to the owner of the equipment or to the responsible party who maintains the system Installation and Service Manual For use with product built with USEM motor Hazardous Location Motor End ...

Страница 2: ...hazardous location submersible pumps have two factory installed moisture detectors seal failure probes They are in a normally open series circuit in the seal chamber Under normal operating conditions the circuit remains open If the lower seal leaks and moisture enters this chamber the moisture would settle to the bottom of the chamber and will complete the circuit between the moisture detectors Th...

Страница 3: ...rn H O A switch to Hand position on one pump and notice operation If pump is noisy and vibrates rotation is wrong To change rotation interchange any two line leads to pump Do not interchange main incoming lines Check rotation of all pumps in this same manner 5 Now set both H O A switches to Auto position and allow water to rise in sump until one pump starts Allow pump to operate until the level dr...

Страница 4: ...nd cap assembly from connection box 2 Disconnect wires taking note of color number coding 3 Connect wires of new cord and cap assembly in same manner as old one was removed 4 Check for moisture and dryout 5 Reinstall cord and cap assembly on connection box taking care not to pinch wires 6 Check pump for proper rotation before returning to normal service Replacing Stator If motor winding is burned ...

Страница 5: ...D 330K D C GREEN HEAT SENSORS 120 VAC 5A SEAL PROBES 300 VAC 20 MA POWER CORD CONTROL CORD SEE TYPICAL CONTROL CIRCUITRY BELOW CRS RUN CAPACITOR CRS START CAPACITOR CAPACITOR PACK PANEL M RUN LIGHT SEAL FAILURE INDICATOR D C TO SEAL PROBES IN PUMP MOTOR SEAL FAILURE RELAY LEVEL CONTROL CIRCUITRY H O A H A R OVERLOADS CAPACITORS AND OR CONTROLS SHOULD BE LOCATED OUTSIDE HAZARDOUS AREA AND ENCLOSED ...

Страница 6: ... and charge housing with about 10 psi of air Be sure air is dry Do not use air line where water may be trapped in the line Submerge complete unit under water and check for leaks If seals were okay refill seal chamber with oil Lay pump on side for this oil filling with oil fill hole upright Do not completely fill leave oil about 1 below plug hole Use only Hydromatic submersible oil or high grade tr...

Страница 7: ...with Megger for grounds before operating the pump 15 Check pump for proper rotation before returning to normal service Pump Notes ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ___________________________________...

Страница 8: ...Buna n 1 11049 001 1 Tungsten Carbide Buna n C2 8100 000 4 Carbon Ceramic Buna n 1 8100 002 4 Tungsten Carbide Buna n D2 2921 004 1 SCREW CAP 1 D3 8023 001 1 WASHER IMPELLER SST 1 D4 8212 000 2 VOLUTE 1 1 8213 008 2 IMPELLER 4 69 1 8213 004 2 IMPELLER 5 8213 005 2 IMPELLER 5 69 Ref Part Part No No Description Qty Ref Part Part No No Description Qty PUMP PUMP V Ø RPM Connection Rotor Stator Connect...

Страница 9: ...9 S4HVX ...

Страница 10: ... PROBE TEST RESISTOR ON HAZARDOUS LOCATION ONLY PROBE TEST RESISTOR ON HAZARDOUS LOCATION ONLY PROBE TEST RESISTOR ON HAZARDOUS LOCATION ONLY PROBE TEST RESISTOR ON HAZARDOUS LOCATION ONLY Wiring Diagrams ...

Страница 11: ..._____________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ __________...

Страница 12: ..._____________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ __________...

Страница 13: ..._____________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ __________...

Страница 14: ...rdance with the printed instructions provided b to failures resulting from abuse accident or negligence c to normal maintenance services and parts used in connection with such service d to units which are not installed in accordance with applicable local codes ordinances and good trade practices e if the unit is moved from its original installation location f if unit is used for purposes other tha...

Страница 15: ......

Страница 16: ...g Line Voltage _________________________________Actual ___________________________________ Voltage to Pumps _____________________________________Actual ___________________________________ Type of Junction Box __________________________________Manufacturer of Junction Box ______________ Are Floats Installed in Wet Well Yes No Are Floats Set to Engineer s Specs Yes No Are Floats Wired for Proper Seq...

Отзывы: