HydroLogic EvolitionRO1000 Скачать руководство пользователя страница 2

STEP 2:

Install carbon pre-filter. The pre-filter can 
only be installed in the manifold in the 
position shown. The other two openings 
in the manifold are for the membranes.

STEP 4:

Install RO membranes. 
Carefully push the first 
membrane into the position 
shown. Push it straight down 
into the hole of the manifold 
until both o-rings are seated 
in the hole. Do not rock 
membrane back and forth 
to install. Install housing 
over membrane. 

Repeat this step for 
second membrane. 

STEP 10:

Install blue 3/8" purified water tubing and 3/8" black waste 
water tubing into corresponding elbow connector fittings as 
shown. The 3/8" inline shut-off valve should only be installed
on blue purified water line to shut system off/on. 

NEVER install the shut-off valve on the black waste 
water line!

 This has to be able to drain waste water freely 

and without obstruction.

STEP 1:

Put a thin layer of lube on o-rings of 3 housings 
and both o-rings on 2 membranes. 

STEP 7:

Install the pressure gauge assembly. Push short length of 
tubing into the left side of the gauge. Push the other end 
of the tubing in to the elbow connector fitting*.

STEP 9:

Install 1/2" white inlet tubing. Push tubing into pressure 
gauge fitting. Push garden hose inlet fitting 
onto other end of tubing. The fitting is 
compatible with garden hoses and 
hose bibs. Other feed valves are
available, on inquirey. 

STEP 5:

Lube the o-rings on each of the 3 elbow connector fittings*
and push them into the corresponding ports on the manifold. 
The back of each elbow connector fitting has a symbol that 
corresponds to the symbol next to the manifold ports.

STEP 6:

Install the pressure gauge assembly. Push short length of 
tubing into the left side gauge. Push the other end of the  
tubing into the white 1/2” QC elbow feed fitting*. 

STEP 8:

Install the support leg as shown. 

STEP 3:

Use the support leg as a filter housing 
wrench to tighten down the housing. Once the 
housing is hand-tight, crank down one quarter 
turn with the wrench. There’s no need for the 
         flange on the bottom of the housing to 
             come in contact with the flange 
             on the manifold. 

NOTES:

The black drain line must be unrestricted. 
Under normal parameters, the system is 
designed to drain at a ratio of 2 parts 
drain to 1 part product water (using green elbow fitting).
*For 1:1 ratio, use orange elbow fitting instead of green.

The optional 

drain saddle

 

(shown above)

 

is an alternative way 

to run your drain line. You can also be creative in using the drain 
water, i.e. landscape drip systems, refilling household storage 
tanks, etc. 

Flush the system for 1 hour before using product 
water. Always take your product water PPM 
readings after 5 minutes of running the system 
once it has sat idle for several hours.

CONGRATULATIONS!

The 

Evolution-

RO

1000

®

 should now be producing pure 

water at fast flow rates.

For further assistance or more detailed information please 
refer to the main instruction manual.

For all return, warranty, and repair issues please 
DO NOT contact your dealer.

 Contact Hydro-Logic directly 

at: 

888-426-5644

 or 

www.hydrologicsystems.com.

 

 

See back page for options and accessories.

Apply lube here

Tighten

Apply lube here

Отзывы: