2
1
3
4
5
6
7
2a
2
1
3
4
5
6
7
2a
GB
Mounting sequence
1. Insert the gear into the profile (pos.1)
2. Slide the square pin (pos.2) at an angle into the gear taking care that the retaining nose
(pos.2a) fits correctly
3. Press the rosette (pos.3) into the profile opening
4. Insert the fixing sleeve (pos.4) into the rosette (pos.3)
5. Slide the coil spring (pos.5) onto the fixing sleeve (pos.4)
6. Push the handle (pos.6) over the previously assembled parts (pos. 2,3,4 and 5) until it
rests against the rosette and hold it there
7. Screw in the threaded pin (pos.7) making sure that the pointed end sits tightly in the notch
of the square pin.
8. Fix the gear (pos.1) into the profile
Representations in closed position
Änderungen vorbehalten. Subject to alterations.
57501
5
Montagereihenfolge
D
1. Getriebe ins Profil (Pos. 1) legen.
2. Vierkantstift (Pos. 2) schräg in das Getriebe schieben und darauf achten, dass die
Hinterhackung (Pos. 2a) korrekt sitzt.
3. Rosette (Pos. 3) in die Profilaussparung eindrücken.
4. Fixierhülse (Pos. 4) in die Rosette (Pos. 3) einsetzen.
5. Spiralfeder (Pos. 5) auf die Fixierhülse (Pos. 4) aufschieben.
6. Griff (Pos. 6) in die vorher montierten Teile (Pos. 2, 3, 4 + 5) bis zum Anliegen des Griffes
an der Rosette drücken und halten.
7. Den Gewindestift (Pos. 7) einschrauben und darauf achten, dass die Spitze in der
Einkerbung des Vierkantstiftes formschlüssig sitzt.
8. Getriebe (Pos. 1) im Profil fixieren.
Darstellungen in Geschlossenstellung