4.

 

Installation 

4.1 Recommended Tools and Equipment for this Installation 

Electric Drill –  

Impact, Variable Speed, Reversible 

Drill Bits 

Masonry: 6mm, 10mm 
Steel: 6mm, 10mm, 12mm 

Hacksaw 
Screwdriver - 

Ө

 3mm 

Screwdriver - 

⊕ 6mm

 

Spirit Level 
Tape Measure – 5m 
Hammer 
Spanners 

Sockets: 8mm, 11mm, 13mm 
Flat/Ring: 10mm, 11mm, 13mm, 14mm 

Step Ladder – 1,7m ~ 2m high 
Extension Lead – to suit 

 

4.2

 

Installing the Operator and Rail 

 

With the Release Lever pointing away from the 
Spring, fit the Carriage to the Base using 4 
Phillips Screws. 
 
Attach the Release Cord to the Release Lever. 

 

 

 

While engaging the motor shaft with the 
sprocket, place the Rail on top of the Power 
Head. 
 
Bolt the rectangular Saddle to the Cross 
Member on the Rail in the space at the front of 
the operator. 
Secure the Tapered Saddles to the four Studs 
with Flange Nuts. 

 

 

 

Mount the Anchor Bracket to the front wall on 
the door centre-line. 
Secure the foot of the Rail to the Anchor 
Bracket. 

 

Once the Power Head has been suspended, fit 
the Connecting Arms as shown, using the Pins 
and ‘R’ Clips. 
 
 Overlap the Arms and bolt them such that the 
short section is horizontal. 

 

 

 

Base 

Carriage 

Release 

Lever 

Spring 

Horizontal 

Pin & ‘R’ Clip 

Bolts 

Содержание Digi One

Страница 1: ...Types of Doors that can be automated using the digi one Sectional overhead doors single double steel or timber Tip up doors steel or timber ...

Страница 2: ...gs should be greased Tracks should be well secured with correct clearances and be clean and free of grime Badly worn hinges rollers and bushings should be repaired or replaced Remove all unnecessary ropes brackets levers etc Caution Garage doors door springs cables pulleys brackets and hardware are under extreme force and can cause serious personal injury Note Most complaints of unsatisfactory gar...

Страница 3: ...Base using 4 Phillips Screws Attach the Release Cord to the Release Lever While engaging the motor shaft with the sprocket place the Rail on top of the Power Head Bolt the rectangular Saddle to the Cross Member on the Rail in the space at the front of the operator Secure the Tapered Saddles to the four Studs with Flange Nuts Mount the Anchor Bracket to the front wall on the door centre line Secure...

Страница 4: ...ng the Light Lens Should the main cover need to be removed remove the screw at the front and support the cover so that the hook at the rear is not stressed Push Button If required make the connections to the Push Button and Common terminals Safety Beam If required make these connections to the 24V DC Common and Beam N C terminals Back up Battery Optional Connect the positive wire to Red and the ne...

Страница 5: ...and hold the SET button until P1 is displayed P1 P1 P1 P1 Press the UP button twice P3 is displayed P3 P3 P3 P3 Press the SET button to show the beam Status H0 means Disabled H1 means Enabled H0 H0 H0 H0 H1 H1 H1 H1 Press the UP button to Enable H1 is displayed H1 H1 H1 H1 Press the DOWN button to Disable H0 is displayed H0 H0 H0 H0 Press the SET button to confirm and exit NOTE If Safety Beams are...

Страница 6: ...removal or re installation of a repaired or replaced unit transport costs incurred in getting the product to Hydro Hydro will quote for in situ warranty repairs if requested damage to the product caused by lightning power surges or incorrect installation the product if used to automate more than one door at a time the product if installed outdoors including carports The product if installed in exc...

Отзывы: