Hydraram HDG-110R Скачать руководство пользователя страница 6

6

 

Terms of Guarantee 

Hydraram 

provides a warranty of 12 months from the date of delivery. 

All defective parts proven to be caused by faults in either manufacture, production or 
material are covered by the warranty. 
Defective parts that are replaced and fall under guarantee become property of 

Hydraram

They must be kept available and returned immediately, in complete and unaltered 
condition, upon the first request from 

Hydraram

Any claim made under guarantee will only be taken into consideration once a written 
appeal is made to the dealer or 

Hydraram

. This must be done directly after the damage or 

fault occurs and at least within 24 hours of any irregularities and problems arising. 
All claims under conditions of the warranty must contain the following data; the type of 
machine the product has been mounted on, the serial number of the grab, the record of 
the defective part(s and a description of the fault, photographs, copy of the delivery 
papers and invoice and a copy of the invoice of the piece of equipment concerned. 
Minor repairs can be carried out in consultation with the dealer; the necessary parts 
which fall under the warrantee, will be delivered without charge. For larger repairs the 
grab should be sent to your dealer or 

Hydraram

 for repairs or modifications. The work and 

necessary parts are free of charge. However, transport costs and call-out charges to and 
from your dealer or 

Hydraram

 are not covered.  

The 

Hydraram

  is  not  liable  for  consequential  loss  caused  by  a  defective 

demolition

 

Grab (consequential loss to excavators, consequential loss due to a stationary excavator 
or the 

suspending of work activity). 

Excluded from Guarantee: 

Damage caused by faulty  assembly of a machine and or the hydraulic system,
improper maintenance without expertise and transport damage.

Defects resulting from improper repairs and/or maintenance including that carried
out by an unauthorised third party.

Defects arising from neglect or improper execution of preventive maintenance
procedures e.g. regular lubrication or greasing.

Defects to parts which are subject to normal wear like blades.

Consequential loss caused by failure to replace normal wearing parts in time

N.B. If defective or worn down parts are replaced by non-original parts, the entire 
warranty and liability will cease to apply. 

Содержание HDG-110R

Страница 1: ...1 CE Operating and Maintenance Manual HDG 110R Demolition and Sorting Grab...

Страница 2: ...piece of equipment for excavators The demolition grab is available in various weights capacities and versions and is always a fast and purpose built demolition device It is imperative you read this m...

Страница 3: ...pliance 4 Safety regulations 5 Conditions of guarantee 6 Operation 7 Daily maintenance 8 Lubrication schedule 9 Exploded view Total 10 Part list Total 1 11 Part list Total 2 12 Partslist exploded view...

Страница 4: ...ould draw your attention to the fact that the demolition grab product is designed to be assembled with another machine and that the product on the grounds of the machine Guide Line can only be used on...

Страница 5: ...rab and consult the technical specifications in this manual When in doubt contact the supplier The weight of the grab increased by the weight of the load being picked up must never exceed the maximum...

Страница 6: ...carried out in consultation with the dealer the necessary parts which fall under the warrantee will be delivered without charge For larger repairs the grab should be sent to your dealer or Hydraram f...

Страница 7: ...nd only briefly maximum of 10 of the working time at 100 bar The oil flow and pressure of the pinching opening and closing of the sorting grab needs to be controlled and adjusted Check if the hydrauli...

Страница 8: ...onnected Before disconnecting ensure there is no pressure on the hoses Consult the manual for the excavator The grab must be lubricated once every 8 operating hours with the same lubricant recommended...

Страница 9: ...e Picture 3 Lubricating pivoting points 1 Lubricate 1 x per 8 operating hours Picture 5 Lubricating rotator 1 Lubricate 1 x per 8 operating hours Picture 4 Lubricating pivoting points 1 Lubricate 1 x...

Страница 10: ...10 Exploded View HDG 110R TOTAL...

Страница 11: ...D 011 12 2 Disk spring S803D 012 13 2 Castellated nut M42 S803D 013 14 2 Spline pin 8mm x 60 secure on M42 S803D 014 15 2 Spline pin16mm S803D 015 16 1 Locker plate Linkage axis top long 50mm S803D 01...

Страница 12: ...in connect block rotation function 1 2 G S803D 038 39 2 Main connect nipple rotation function S803D 039 42 1 set Seal kit hydro motor for 1 motor S803D 042 43 1 set Bolt set hydro motor for 2 motors S...

Страница 13: ...onnection 2 ports S803D 101 102 1 Piston rod S803D 102 103 1 Cylinder nut S803D 103 104 1 Piston S803D 104 105 2 Bearing cylinder housing S803D 105 106 1 Bearing cylinder nut S803D 106 107 1 set Cylin...

Страница 14: ...nut S803D 103 104 1 Piston S803D 104 105 2 Bearing cylinder housing S803D 105 106 1 Bearing cylinder nut S803D 106 107 1 set Cylinder seal kit S803D 107 108 1 Secure bolt M8 x12 S803D 108 109 1 Secure...

Страница 15: ...D 202 203 1 C O D cover S803D 203 204 1 C O D connection block S803D 204 205 1 Bearing S803D 205 206 1 Seeger circlip ring S803D 206 207 1 set Bolt set C O D connection block 2 pcs S803D 207 208 1 set...

Страница 16: ...r pitch and metric size and maximum torque specified prior to fastening Bolt size Torque Nm Torque Kg m Bolt 10 9 Bolt 10 9 M8 40 Nm 4 Kgm M10 80 Nm 8 Kgm M12 130 Nm 13 Kgm M12x1 25 110 Nm 11 Kgm Note...

Отзывы: