background image

15

03/06

ID#  M88724C

13.

5

8

Refer To Instructions

Included With Rim

Hardware For Rim

Assembly.

Before starting rim assembly, tighten nut (26) until it is positioned 6-3/4” from
the end of the rod (14) as shown (Figure A).

Remove rim cover (16), attach rim assembly (3) to backboard (41) and
reattach rim cover (16).

** For rim assembly, see instructions included with rim.

3

Rim Assembly

6

6

41

7

IMPORTANT!

Carefully cut and peel
protective film away from
board prior to attaching rim.

16

6-3/4”

FIGURE

A.

15

15

26

14

Содержание High End Residential In-Ground Basketball System

Страница 1: ...089 U S A Toll Free Customer Service Number for U S 1 800 334 9111 Hydra Rib Internet Address http www hydra rib com Spalding Internet Address http www spalding com Write Model Number From Box Here WA...

Страница 2: ...g contact utility company to locate underground power cables gas and water lines Ensure there are no overhead power lines within 20 ft 7 m radius of pole location Climate corrosion excessive use or mi...

Страница 3: ...6 203635 Washer Flat 053 I D 1 08 O D Black Oxide 22 10 203637 Nut Lock Nylon Insert 1 2 13 Black Oxide 23 1 203641 Bolt Hex Head 1 2 13 x 6 24 9 204046 Washer 5 8 Flat 656 I D 1 313 O D Black Oxide 2...

Страница 4: ...9 4 Item 28 3 Item 20 1 Item 23 1 Item 25 8 Item 26 1 Item 22 10 Item 36 1 Item 37 1 HARDWARE IDENTIFIER NUTS WASHERS SPACERS HARDWARE IDENTIFIER BOLTS SCREWS Item 35 1 Item 38 14 Item 39 4 Item 40 8...

Страница 5: ...NTACT UTILITIES BEFORE DIGGING WARNING 24 61 cm 48 121 9 cm PLAYING SURFACE GROUND SURFACE 24 61 cm 48 121 9 cm 1 2 19 25 Install mounting bolts 19 and nuts 25 to ground tube 2 as shown Nuts on the to...

Страница 6: ...1 2 54 cm SIDE VIEW DRAINAGE HILL PLAYING SURFACE Fill hole with concrete Tamp down concrete to release air pockets and build drainage hill 3 Insert rebar 10 through holes in ground tube assembly 2 as...

Страница 7: ...sembly 2 into cement as shown Move assembly around to release any air pockets in cement then rest mounting plate on cement drainage hill Apply some pressure to level mounting plate on top of drainage...

Страница 8: ...8 ID M88724C 03 06 Insert bushings 38 39 40 into areas shown 38 38 38 1 41 39 39 17 18 40 40 40 40 40 40 40 40 39 39 6 38 38 38 38 38 38 38 40 39 IMPORTANT Bushing types are identified with a letter...

Страница 9: ...mounting plate 2 as shown 7A 22 28 1 PLAYING SURFACE 2 Insert bolt 28 through holes in plate and pole and secure with nut 22 7B PLAYING SURFACE SCRAP WOOD NOT INCLUDED THREE CAPABLE ADULTS REQUIRED FO...

Страница 10: ...eaded assembly rod 14 can be installed and secured by the THIRD person While pole is being supported by TWO capable adults position rod 14 and lock into place with hitch pin 36 and cotter pin 37 Slide...

Страница 11: ...forward position attach both upper and lower yokes 17 18 to pole as shown 9 22 21 28 21 17 18 THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS IN...

Страница 12: ...Attach elevator adjustment 12 to lower yoke 18 10 THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND OR PROPERTY DAMAGE WARNING 22 12 3...

Страница 13: ...24C Attach elevator adjustment 12 to pole bracket 11 THREE CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND OR PROPERTY DAMAGE WARNING 12 23...

Страница 14: ...ware FIG A Use hardware as shown in FIG B 12 A FIG A FIG C Then hinge board to match up with holes in lower yoke 18 FIG C and secure with hardware as shown in FIG D 21 22 21 41 FIG B 22 21 21 34 34 21...

Страница 15: ...t is positioned 6 3 4 from the end of the rod 14 as shown Figure A Remove rim cover 16 attach rim assembly 3 to backboard 41 and reattach rim cover 16 For rim assembly see instructions included with r...

Страница 16: ...ULD FACE AWAY FROM BACKBOARD Set up For Right Side Set up For Left Side 7 8 910 29 29 32 31 30 30 Attach height indicators to lower yoke in area shown by turning screws 29 into place with a Phillips h...

Страница 17: ...pitting chipping and repaint with with exterior enamel paint If rust has penetra ted through the steel anywhe re replace the pole immedia tel y Check system before each use for proper ballast loose ha...

Страница 18: ...36 This will allow the removal of the threaded assembly rod 14 which is no longer necessary for the remainder of the assembly and installation of system 35 37 36 24 26 14 25 ONLY AFTER THE ANCHOR PLAT...

Страница 19: ...WARNING HEIGHT ADJUSTMENT LABELS BEFORE USING THIS UNIT FAILURE TO FOLLOW OPERATING INSTRUCTIONS COULD RESULT IN INJURY OR DAMAGE TO PROPERTY WARNING Check system leveling Pole 1 should be level in a...

Страница 20: ...involved in the removal installation or replacement of the defective repaired parts from to your Hydra Rib system will be your the purchaser s responsibility Shipping charges for replaced or warranted...

Отзывы: