
Good planning is a key to a successful and safe
tower installation. If you're not sure about a
careful, safe installation, don't try to do it your-
self. Call for professional help (Yellow Pages
under Towers or your local power company).
During shipment or
may have resulted to
foundation assembly.
while in storage, damage
the tabs on the tower base
The tower should be as close as possible to its
related equipment. Determine the best possible
site while thinking about power lines, but also
think about overhanging tree limbs that may be
blown into the tower during high winds.
Dig a hole 42" (1067 mm) square by 72" (1829
mm) deep as shown in Figure 3.
Before installation of this tower, check proper
alignment of the tabs. To do this, set the tower
horizontally on two supports. Attach the base
foundation assembly to the tower using the
three-quarter inch (3/4") hardware, as shown
below.
If the tabs on the base foundation assembly are
out of alignment, use a large hammer to realign.
Construct a wooden frame around the hole to
support the base foundation assembly as shown
in Figure 4.
Содержание HG-54HD
Страница 1: ...HG 54HD 54 Foot Self Supporting Tower ...
Страница 2: ......
Страница 3: ...Overall View of HG 54HD Tower ii ...
Страница 5: ......
Страница 7: ......
Страница 12: ......
Страница 14: ......
Страница 18: ......
Страница 19: ......