Figure 11 Supporting Tower While Attaching
Related Products
Lift tower into place with gin pole, block and
tackle as shown in Figure 12.
Ov£~~HG EpR POVE: ~
-
EZ.Sa..l woE,
~Yi
l) ec
l DEEV
-
-
vV~C00'.rES -"ED ON - 5.15 ti 2•a
-
+
Figure 12
Constructing Gin
Pole
After tower is up, put all base bolts in place
and secure tower in vertical position
3