HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.)
P/N 0430502
23
T
O
I
NSTALL
B
UMPERS
:
A.
Starting from left end of line-
up, insert 2 foot (610 mm)
starter bumper into the front
Top Bumper Retainer. Swing
Bumper down into position
until it “snaps” into place on
the bottom of the retainer.
B.
Install full length bumper to
overlap merchandiser joint.
Slide toward left, closing all
gaps. Repeat for rest of line-
up.
C.
Use a miter box and fine
toothed saw to cut last full-
length bumper.
See Figures 16 and 17.
24
Re-install all items that
were removed in Step 1.
Retainer
2 Foot (610mm) Starter Bumper
Full Length Bumper
2 Foot (610mm) Starter Bumper
Full Length Bumper
Figure 16. Installing Impact Bumper
Figure 17. Installing and offsetting Bumpers
Vertical Glass Service Merchandisers Joining Instruction
Bumper
Bumper
Retainer
"Snap"
Bumper
Miter Box
15