Hussmann 10HD Скачать руководство пользователя страница 3

 
 

INTRODUCTION –  
 
              The HS and HD models have been 
designed to give maximum performance 
with minimum energy consumption.  They 
have the versatility in product temperature 
range to be used for storage at sub zero to 
dipping at desired above zero tempera-
tures.  All cabinets are UL and UL sanita-
tion listed. 
 
INSPECTION –  
 
             Upon receipt of the cabinet, care-
fully examine the crating for damage.  If 
damage is found make a note on the deliv-
ery ticket before signing.  Carefully remove 
shipping crate and examine cabinet for 
“concealed” damage.  If damage is found 
contact the delivering carrier immediately 
and have his agent prepare an inspection 
report for the purpose of filing a claim  
THIS IS YOUR RESPONSIBILITY. 
 
SPECIFICATIONS –  
 
BASE –  
 
             The cabinet base is  an all welded as-
sembly of very heavy gauge steel to estab-
lish a strong foundation on which the rest 
of the cabinet is built. 
 
EXTERIOR SHELL –  
 
             The shell is formed from heavy 
gauge steel and is welded together as an as-
sembly and then welded to the cabinet base 
assembly to give complete strength and du-
rability.   This assembly is processed 
through a chemical  treatment and painted  
 

with an enamel powder paint for a lasting 
finish. 
 
INTERIOR LINER –  
 
             The liner is an all welded steel ass em-
bly.  Copper evaporator tubing is fastened 
to the exterior of the liner; and maximum 
heat transfer is  further enhanced with the 
addition of a conductive material on both 
top and bottom of the tubing.  The liner is 
also chemical treated and painted with an 
enamel powder paint for a lasting finish. 
 
SUB-TOP –  
 
             The sub-top is an all welded heavy 
gauge galvanized assembly with integral 
molded plastic breakers.  The sub top ties 
the shell and liner assemblies together and 
s erves as  a back up for the main top to pre-
vent denting. 
 
INSULATION –  
 
             The shell, liner and sub top assem-
blies are foamed in place with a polyure-
thane insulation providing outstanding insu-
lating qualities and s olid unitized construc-
tion. 
 
MAINTOP –   
 
             The main top is a one piece design of 
heavy gauge 18-8 rust proof s tainless steel.  
It has a brush satin finish to minimize 
scratching and maintain a lasting clean ap-
pearance. 
 
 

 

 

 

Содержание 10HD

Страница 1: ...F 8 Ice Cream Dipping and Storage Chest P N OII HD HS 8HDF January 2006 First Call for help US and Canada 1 800 922 1919 Soporte T cnico y Asistencia M xico 01 800 522 1900 For a Service Network Locat...

Страница 2: ...sulation and 3 Main Top Condensing Unit Cabinet Dimensions Electrical and Capacity 4 Installation and Start Up 5 Temperature Control and Defrosting 5 Cleaning Condenser 6 Cleaning Exterior 6 Cleaning...

Страница 3: ...sembly and then welded to the cabinet base assembly to give complete strength and du rability This assembly is processed through a chemical treatment and painted with an enamel powder paint for a las...

Страница 4: ...8 25 5 8 8 HDF 54 1 16 30 1 2 32 1 2 49 15 16 26 3 8 25 5 8 Add 8 to top for syrup rail ELECTRICAL CAPACITY Volts Run Breaker Ship Cubic 2 1 2 3 of Amps Size Wt Feet gal gal Lids 115 3 4 15 amp 188 4...

Страница 5: ...VOLTAGE AS MEASURED AT THE COMPRESSOR TERMINAL DUR ING OPERATION MUST NOT VARY MORE THAN 5 FROM CABINET SE RIAL PLATE RATING NOTE DO NOT DRILL ANY HOLES IN SIDE OF CABINET WITHOUT FIRST GETTING INSTR...

Страница 6: ...of the cabinet use a soft cloth or sponge with wa ter and a mild detergent Rinse and wipe dry CLEANING INTERIOR For cleaning the interior of the liner storage area a flush out drain has been provided...

Страница 7: ...l plate for proper electrical requirements 2 Defective compressor 2 Replace 3 Defective relay 3 Replace 4 Restriction pinched cap tube 4 Repair or replace 5 Restriction moisture 5 Leak check replace d...

Страница 8: ...control feeler tube into well 3 Short on refrigerant 3 Leak check change drier and recharge Compressor runs continuously product too warm 1 Short on refrigerant 1 Leak check change dryers evacuate and...

Страница 9: ...ions Remove old heater from slot and carefully remove leads from cavity and disconnect Remove old heater from slot with leads aligned with connector cavity Connect heater leads and push excess leads i...

Страница 10: ......

Страница 11: ...XXXXXXXXXX XXXX XXXX E C N TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL DECIMAL HOLE LOCATION SPACING M S MOTOR COMPRESSOR OVERLOAD HIGH WIRES PRESSURE CONNECTOR CONTROL HEATER BLK 1 GRN ORN START...

Страница 12: ...IZE RED DIE NO XXXX TAP CONNECTORS XXX BY XX XX XX DATE REV E C N HOLE LOCATION SPACING 1 64 HD 6 R 404A M S HEATER WIRES CONNECTOR ORN RED GRN ANTI SWEAT HEATERS BLK ORN WHT RELAY START 0 031 1 CAP T...

Страница 13: ...AWN BY DATE DRAWN APPROVED BY JWL 12 19 95 INCHES 1 OF 1 TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL 1 32 DECIMAL 0 031 ANGULAR 1 HOLE LOCATION SPACING 1 64 COMPRESSOR HS 2 HD 4 R 404A M S RELAY...

Страница 14: ...19 95 INCHES 1 OF 1 TOLERANCES UNLESS OTHERWISE SPECIFIED FRACTIONAL 1 32 DECIMAL 0 031 ANGULAR 1 HOLE LOCATION SPACING 1 64 S R C 1 S N 2 START CAP COND FAN GRND COMPRESSOR MOTOR OVERLOAD RELAY TEMP...

Отзывы: