11 SERVICE WORK ON THE CHASSIS
52
A00149-10
Main work
–
Pull fuel tank breather
1
out of the steering stem.
–
Loosen screws
2
.
–
Loosen screw
3
.
–
Loosen and retighten nut
4
.
Guideline
Nut, steering stem
M20x1.5
10 Nm (7.4 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp
to avoid stresses.
–
Tighten screw
3
.
Guideline
Screw, top triple
clamp
M8
20 Nm (14.8 lbf ft)
–
Tighten screws
2
.
Guideline
Screw, top triple
clamp
M8
20 Nm (14.8 lbf ft)
–
Position the fuel tank breather
1
in the steering stem.
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
11.13
Greasing the steering head bearing
H02387-01
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
11.14
Removing the start number plate
A00137-10
–
Remove screw
1
.
–
Unhook the start number plate from the brake line and
remove it.
Содержание TC 85
Страница 1: ...OWNER S MANUAL 2018 TC 85 Art no 3402163en ...
Страница 2: ......