3. Install more carriage bolts (D) and handle knobs
(C) to secure the upper handle (A) to the lower
handle (E).
D
E
A
C
To install the chute deflector and
chute rotator head
1. Put the chute deflector assembly on the top of
the chute base with the discharge opening in the
direction of the front of the product.
2. Put the chute rotator head (A) on the chute
bracket (B). Rotate the chute assembly to align
the pins under the chute rotator head with the
holes in the chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
4. Attach a locknut (G) on the threaded stud and
tighten.
A
F
B
D
C
E
5. Put the cables through the double clip (I) to
attach the rotator cables (H) to the lower handle.
H
I
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the
discharge chute with a carriage bolt (B) and a
5/16-18 locknut (D). Tighten the bolt.
2. Install the remote cable eyelet (E) to the chute
deflector (F) with a shoulder bolt (G), a nylon
washer (C), and tighten with a ¼-20 locknut (K).
The cable eyelet will be loose on the shoulder
bolt.
10
1674 - 004 - 18.05.2021
Содержание ST 324
Страница 81: ...ST 324 ST 327 ST 330 Niveau de vibrations au niveau de la poi gnée m s2 4 57 4 42 5 83 1674 004 18 05 2021 81 ...
Страница 82: ...82 1674 004 18 05 2021 ...
Страница 83: ...1674 004 18 05 2021 83 ...
Страница 84: ...Original instructions Instrucciones originales Instructions d origine www husqvarna com 1142729 49 2021 05 26 ...