
5. Move the truss screed sections together until the bolt
(D) goes into the holder (F).
D
F
H
E
G
G
6. Turn the bolt (D) with a screwdriver.
Note The bolt has a right hand thread.
7. Make sure that the plugs (G), couplings (E) and
eccentric elements (H) are aligned.
8. Tighten the bolt (D) fully.
9. Tighten the nuts (A) and the screws (B) on the plugs
(G) with 2 flat 19 mm wrenches.
C
A
A
B
G
G
10. Do the necessary angle adjustment with the bolt (D).
11. Tighten the nuts (C) with a 36 mm wrench.
To install the truss screed extension
1. Remove the nuts (A).
A
B
2. Put the truss screed extension against the free end
of the truss screed section.
Note The truss screed extension cannot be installed
on the drive unit.
3. Tighten the screws (B) and the nuts (A).
To install the outrigger
The outrigger is available as an optional accessory. Use
the outrigger when the product is on support rails. The
outrigger can be installed on the 2 ends of the product.
Note The outrigger cannot be used together with an
extension.
1. Remove the handles.
8
1499 - 001 -