![Husqvarna 2009-01 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/husqvarna/2009-01/2009-01_operator-and-parts-manual_170499008.webp)
9
3
MOUNTING BLOWER ASSEMBLY
Outer Pulley Cover
Pin
Hairpin Cotter
Rear Mount Bracket
Contact Area
1. Position blower over the discharge tabs on the
deck and set blower onto the deck.
2. Be sure the blower is sitting flush against the
outside of the deck.
3. Install the front mount bracket to the deck with the
pin and hairpin cotter supplied with the kit.
ASSEMBLY
1. Make sure the tension release lever is forward or
disengaged.
2. Place the belt over the pulley on the deck. Refer to
illustration for proper routing.
3. Move the tension release arm to the rear and
engage in the latch.
4
INSTALLING DRIVE BELT
Rear Of Deck
Idler Pulleys
Outer Pulley
Twist in Belt
Tension Release Arm
Содержание 2009-01
Страница 1: ...Blower Kit 61 Collection System 966004801 Operator and Parts Manual ...
Страница 15: ...16 6 5 4 4 3 3 1 9 2 12 10 7 8 11 REPAIR PARTS ...
Страница 17: ...18 1 2 4 6 7 8 9 10 11 7 5 12 12 3 3 REPAIR PARTS ...
Страница 19: ...20 REPAIR PARTS 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 6 18 11 18 18 ...
Страница 23: ...P N 115 145327 R01 05 09 09 ...