5
6
CLEANING
During installation, your fence may have collected dirt. In most cases to clean your new fence you can just hose it
off. For tougher marks, orange cleaner and a scotch brite pad works well to take those off.
5
HANG GATES
NOTE:
Example on gate posts setting. For a 3’ Gate you will need to have 36” between the post and a 4’ gate you
will need 48” between the posts. For double gates, such as 12’ gates, set post 144” between post. The gates will be
made to fit those openings. The extra space will allow for the hinges and latch.
STEP 1
Position the gate in the gate opening and block up the gate as necessary to line up the horizontal gate rails with those
of the fence. Hinge placement is optional. We recommend placing the top hinge about 4”- 6” down from the top of
the gate frame and the other about 4”- 6” up from the bottom of the bottom rail. To install the latch follow the pre-
packaged install instructions in the package.
For more information contact:
HUSKER VINYL inc.
402-923-0323
1-866-918-4695 (toll-free)
47287 U.S. Hwy. 81, Humphrey, NE 68642
e-mail: [email protected] • www.huskervinyl.com
1”
1”
Blocks
HUSKER VINYL
R
anch
R
ail
F
ence
& G
ate
Installation Instructions