11
GETTING ST
ARTED
Getting started
First, activate the Scene Controller by pulling both plastic tabs
from the back battery compartment.
Inserting the Scene Controller module into the PowerView
™
Pebble
™
(hand-held):
1.
Center the “select” button on the Scene Controller module
above the indentation on the bottom rim of the Pebble.
2.
Align the ribs on the module with the grooves in the Pebble.
3.
Gently push the Scene Controller module into the Pebble
until it is snug.
Mounting the PowerView
™
Surface:
1.
Choose a location to mount the Surface.
2.
Orient the Surface mounting plate so that the
Hunter Douglas logo is horizontal and level. Mark
screw holes.
3.
If you are mounting the Surface onto drywall, use a
7
/
32
" drill bit to drill pilot holes. Tap drywall anchors into
the pilot holes until the flange of the anchor is flush
with the drywall.
4.
If you are mounting the Surface onto wood, use a
3
/
32
" drill bit to drill the screw holes.
5.
Attach the Surface mounting plate using the screws
provided.
6.
Align the Surface ring with its mounting plate and twist
the Surface ring clockwise to lock it in place.
Inserting the Scene Controller module in the Surface:
1.
Align the ribs on the Scene Controller module with the
grooves on the Surface.
2.
Gently push the module into the Surface until it is snug.
GETTING ST
ARTED
10
Содержание POWERVIEW Motorization
Страница 3: ...Key Components 3 Away...
Страница 6: ...Getting Started 9 Daytime...
Страница 8: ...Programming and Operation 13 Study Time...
Страница 11: ...Battery Replacement 19 Dusk...
Страница 14: ...Troubleshooting 25 Dawn...