52
5. Secure the beam to the lift mechanism arms with the four 1/2-13 X1 1/4 inch hex head cap screws (HHCS).
Ensure that the attachment blocks are fully seated against arms of before tightening. Finger tighten the
screws.
BLOCK
SEATED
AGAINST
ARM
1/2-13 X 1 1/4 INCH HHCS
(4 places)
Figure 89
6. Connect air supply hose to the shop’s 100-175 psi (6.9–12.0 bar) air supply line.
7. Connect the electrical power cord to the AC power source.
Elevating the lift mechanism in the next step is done to make installation of the carrier
easier.
8. Turn “ON” the balancer. Move the lift control handle (located on the front of the balancer upward to move the
lift approximately halfway up in its travel.
9. Remove the carrier stop hardware that has been shipped in place on the end of the beam.
10. With the trolley carriage toward the operator, slide the carrier, 56-34-1, onto the beam with the rear roller
along the rail.
CARRIER
SIDE VIEW
Figure 90