Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
New Construction – suspended between joists
8
B11
D
E
5/8
1/2
5/8
1/2
B12
1/8 bit
B14
B15
E
B13
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.
B16
41944-01 1/13/2006