Chapter 2 • Preparing for the Installation
1037106-0001 Revision B.03-Draft
11
Chapter 2
Preparing for the Installation
This chapter discusses the following tasks:
•
Inventorying the items required for installation
•
Confirming installer laptop and customer site requirements
•
Inventorying the items
required for installation
To install an HX50 or HX100 remote terminal, first ensure that
you have all of the items in the remote terminal installation kit.
Note:
In the following sections,
installer laptop
refers to the
computer, typically a laptop, used to connect to and commission a
remote terminal.
Содержание HX100
Страница 12: ... Figures xii 1037106 0001 Revision B 03 Draft ...
Страница 14: ... Tables xiv 1037106 0001 Revision B 03 Draft ...
Страница 34: ...Chapter 2 Preparing for the Installation 16 1037106 0001 Revision B 03 Draft ...
Страница 42: ...Chapter 3 Installing the Hardware 24 1037106 0001 Revision B 03 Draft ...
Страница 60: ...Chapter 4 Commissioning the HX50 HX100 Remote Terminal 42 1037106 0001 Revision B 03 Draft ...
Страница 68: ...Chapter 5 Completing the Installation 50 1037106 0001 Revision B 03 Draft ...
Страница 86: ...Chapter 6 Troubleshooting 68 1037106 0001 Revision B 03 Draft ...
Страница 106: ...Chapter 7 The System Control Center 88 1037106 0001 Revision B 03 Draft ...
Страница 128: ...Appendix C Disabling a Web browser s proxy connection 110 1037106 0001 Revision B 03 Draft ...