![Hughes HN9500 Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/hughes/hn9500/hn9500_installation-manual_2182047043.webp)
You must comply with applicable local codes and the grounding requirements in Field Service
Bulletin (FSB),
HNS Broadband Requirements for RG-6 and RG-11 IFL Cable Connectors,
Ground Blocks, and Ground Block Location
(FSB_050518_01). Improper grounding can result
in electric shock injury, property damage, and/or poor router performance.
Labeling the IFL cables
Label the receive and transmit IFL cables at the outdoor point-of-entry and at the indoor location
where the satellite router is installed as follows:
• Wrap a piece of
red
electrical tape around the receive cable, and mark SAT IN on the tape.
• Wrap a piece of
blue
electrical tape around the transmit cable, and mark SAT OUT on the
tape.
Connecting the IFL cables to the router
Connect the transmit and receive IFL cables to the satellite router.
1.
Connect the transmit and receive cables to the connectors on the rear panel of the router as
shown in
Figure 19: Connecting the transmit and receive cables
on page 29.
Figure 19: Connecting the transmit and receive cables
The transmit and receive cable connectors must be securely tightened.
• Make sure each connector is properly aligned (not cross-threaded).
• The connector should be finger tight with no play.
29
HN9500 Satellite Router Installation Guide
1037736-0001 Revision G
Chapter 4
Installing outdoor equipment and antenna
pointing
Содержание HN9500
Страница 1: ...1037736 0001 Revision G February 26 2010 HN9500 Satellite Router Installation Guide ...
Страница 10: ......
Страница 14: ......
Страница 20: ......
Страница 40: ......
Страница 70: ......
Страница 78: ......
Страница 110: ......
Страница 120: ......
Страница 132: ......
Страница 136: ...HN9500 Satellite Router Installation Guide 122 1037736 0001 Revision G Index ...