\\CAD1\Standard\4652\Montageanleitung\Vogelnestbaum_Leimbinder_4652_SO_B_L_1_GBR.doc
4 Abbreviations
AB
Setting time min. 7-8 days
D
C25/30 concrete (for foundations)
Q.ty required: 3.2 m
2
D.be.
Fill in around the central mast with concrete.
(between drainage tube and central mast)
DT
Detail
EDF
turn the ground anchor in to foundation
/ don’t press
F
Fall protection
FOU
Foundation
G
Drainage layer
HK.entf.!!
Remove wooden wedges after concrete work
KELA
Chains should be shortened during installation if necessary.
KNR
Drainage tube (e.g. concrete or PVC duct, Ø 400 mm /
lg. 850 mm on site)
MEb
Pay careful attention to mark when mounting the post.
MKe
Insert the mast into the drainage tube
MSE
After mounting the steel post and the glue-laminated beams, the ropes
must first be hooked in
O.K.
Top edge play level
O.K.F.
Top edge foundation
OAZ
The opening must be show outwards / not in tensile direction
PNU
Lay the net-part packet with the underside around the mast.
PS
Minimum safety area 95.5 m
2
SSch
After putting on the post-cap, grease the hexagon-screw and tight up.
UEA!
Smooth out any unevenness in the foundation that occurs when
screwing in the ground anchor. Otherwise a water accumulation
develops
VO
Pre-assembled
Round off foundation edges (min.R = 100 mm)! Sizes of fundations
are “4-5” (natural ground).
Soil class 4: soft to medium plasticity, interleave bound, with minor
portion of stone (portion < 30% with bigger diameter of 63 mm grain
size) Soil class 5 : ground with soil class 3 and 4 with big portion of
stones (portion > 30% with bigger diameter of 63 mm grain size)
In case of sandy and soft soils, the surface measure of foundations
have to be enlarged for about 50%!