background image

Seiltechnik

 

HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen 

[email protected]

 • 

www.huck.net

 

 

E:\Huck\Montageanleitungen\Englisch\4592-10S-01-en-001.doc 

 

28

6  General maintenance information 

6.1 Maintenance 

intervals 

Maintenance intervals are based on average use. Please note that more fre-
quent inspections and/or maintenance are required if the play equipment is 
subject to intensive use. 

6.2 Inspection 

frequency 

The frequency of inspections must be based on actual use. Factors that affect 
frequency include vandalism, location (e.g. coastal proximity), air pollution and 
the age of the equipment. 

6.3 

Maintenance products and procedures 

All nuts and bolts are hot-dip galvanised or stainless steel. One of the charac-
teristics of stainless steel is that uncontrolled cold welding may occur when the 
nuts are tightened. To prevent this, it is necessary to spray the nuts and bolts 
with Teflon spray or another similar lubricant. 

6.4 Spare 

parts 

All spare parts must conform to the manufacturer’s specifications. 

6.5 

Identifying spare parts 

All spare parts are listed in the parts list. The parts list follows the installation 
requirements. 

6.6 

Special instructions for the disposal of individual equipment compo-
nents 

No special instructions are necessary for the disposal of individual equipment 
components. 

6.7 

Special measures during the break-in period 

No later than 2 weeks after assembly, all screwed connections should be 
checked and tightened if necessary. 

6.8 Drainage 

holes 

All drainage holes should be kept clear. 

6.9 

Maintenance of protective surfaces 

Surfaces providing fall protection must also be maintained regularly. It is par-
ticularly important to maintain the correct level of loose surface material and 
add more if necessary. 

Содержание 4592-10

Страница 1: ...huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 1 A Assembly instructions The Look Out Art 4592 10 Operator ________________________________________________...

Страница 2: ...usen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 2 Revision history Revision 0 2007 06 04 The first allowed version Assembly instruction JF Revision 0 2...

Страница 3: ...h the play equipment standard EN 1176 4 3 Delivery contents parts list with part numbers 7 4 Post installation checks 23 B Maintenance instructions Sixt von Armin Art 4592 10 25 5 Introduction Mainten...

Страница 4: ...be required can be obtained directly from your sup plier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions Following installat...

Страница 5: ...serve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the prop...

Страница 6: ...eces length 5 0 m 159 mm 4 Name and weight of the heaviest component Steel posts 1 piece approx 95 kg 5 Intended age group 4 years and over 6 Please note that this equipment is set in concrete Concret...

Страница 7: ...Size O K Miss ing 1 1 Steel post 159 mm 5 m long 2 1 Play component 3 1 Top plate cover 4 1 Top plate galvanized 100 1 Threaded bolt 2 nuts 2 washers M16 x 165 mm 101 8 Bolts lock washers M12 x 25 VA...

Страница 8: ...erghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 8 3 2 In symbols Table 3 1 Delivery contents in symbols Pos Quantity Symbol 1 1 5 m lang 2 1 3 1 4...

Страница 9: ...g 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 9 104 8 6 3 x 45 mm 105 2 0 02 Liter 106 4 12 x30 f M12 107 15 M12 1...

Страница 10: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 10...

Страница 11: ...14 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 11 Screw locking device glue all screws nuts and sleeves with loctite not l...

Страница 12: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 12 Erection instructions...

Страница 13: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 13...

Страница 14: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 14...

Страница 15: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 15...

Страница 16: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 16...

Страница 17: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 17...

Страница 18: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 18...

Страница 19: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 19...

Страница 20: ...Seiltechnik HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 20...

Страница 21: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 21...

Страница 22: ...m KNR Concrete or plastic pipe Ri U Ring nut and washer as anchor in concrete O K Top level ground surface PS Space required including Safety area ML Mast length above playing level Round off foundati...

Страница 23: ...n the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 4 3 Removal of all...

Страница 24: ......

Страница 25: ...echnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 25 B Maintenance instructions Sixt von Armin Ar...

Страница 26: ...n seiltechnik huck net www huck net E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 26 Revisionshistorie Revision 0 2009 08 05 Erste freigegebene Version Maintenance Instructions JF Revision...

Страница 27: ...guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be...

Страница 28: ...ed cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 6 4 Spare parts All spare parts must co...

Страница 29: ...loose screws should always be tightened and checks carried out to ensure that there are no missing screws e g look out for holes you can see through 6 12 Preventing equipment use Use of the equipment...

Страница 30: ...t 8 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults th...

Страница 31: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net Seiltechnik E Huck Montageanleitungen Englisch 4592 10S 01 en 001 doc 31 Periodic maintenance...

Страница 32: ...ns ropes nets etc for damage and replace if necessary Check rubber parts sleeves etc for wear and tear or damage and replace if necessary If necessary remove excess padding maaaterial from the post fo...

Страница 33: ...dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches Stability check posts bracing foundations etc Ascertaining whether there are any c...

Страница 34: ......

Страница 35: ...________________________________________________________________________ Customer or operator ______________________________________________________________________________ Town Town council Kindergar...

Страница 36: ......

Страница 37: ..._____________ Installation company address ___________________________________________________________ ___________________________________________________________ Responsible assistant assembler _____...

Отзывы: