Seiltechnik
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen
•
www.huck.net
E:\Huck\Montageanleitungen\Englisch\4592-10S-01-en-001.doc
28
6 General maintenance information
6.1 Maintenance
intervals
Maintenance intervals are based on average use. Please note that more fre-
quent inspections and/or maintenance are required if the play equipment is
subject to intensive use.
6.2 Inspection
frequency
The frequency of inspections must be based on actual use. Factors that affect
frequency include vandalism, location (e.g. coastal proximity), air pollution and
the age of the equipment.
6.3
Maintenance products and procedures
All nuts and bolts are hot-dip galvanised or stainless steel. One of the charac-
teristics of stainless steel is that uncontrolled cold welding may occur when the
nuts are tightened. To prevent this, it is necessary to spray the nuts and bolts
with Teflon spray or another similar lubricant.
6.4 Spare
parts
All spare parts must conform to the manufacturer’s specifications.
6.5
Identifying spare parts
All spare parts are listed in the parts list. The parts list follows the installation
requirements.
6.6
Special instructions for the disposal of individual equipment compo-
nents
No special instructions are necessary for the disposal of individual equipment
components.
6.7
Special measures during the break-in period
No later than 2 weeks after assembly, all screwed connections should be
checked and tightened if necessary.
6.8 Drainage
holes
All drainage holes should be kept clear.
6.9
Maintenance of protective surfaces
Surfaces providing fall protection must also be maintained regularly. It is par-
ticularly important to maintain the correct level of loose surface material and
add more if necessary.