![Huck 4585 PS Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/huck/4585-ps/4585-ps_assembly-instructions-manual_2181033007.webp)
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen
[email protected] - www.huck.net
\\CAD1\Standard\4585\Montageanleitung\Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR.doc
7
7.
Round off foundation edges (min.R = 100 mm)! Sizes of fundations are de-
signe
d for soils class“4-5” (natural ground).
Soil class 4: soft to medium plasticity, interleave bound, with minor portion
of stone (portion < 30% with bigger diameter of 63 mm grain size)
Soil class 5: ground with soil class 3 and 4 with big portion of stones (por-
tion > 30% with bigger diameter of 63 mm grain size)
In case of sandy and soft soils, the surface measure of foundations have to
be enlarged for about 50%!
8. assembly time approx. 45 minutes after concreting of the steel posts.
Needed persons: 2
9. Possibly required spare parts can be obtained directly from your supplier or from
the company Huck Seiltechnik GmbH
Adress: Huck Seiltechnik GmbH
Dillerberg 3
D-35614 Aßlar/Berghausen
Tel. +49(0)6443/8311-99
Fax.+49(0)6443/8311-79
10.
We hereby confirm that this play equipment has been tested
and certified in accordance with the play equipment standard EN 1176-1.