
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
[email protected] - www.huck.net
15
Hand over document
After the installation of the equipment pass the installation and
maintenance documents to the operator. The operator has to receive the
hand over documents. The complete filled and signed hand over
document should be sent to the supplier.
Art.-No.: 4577-1-200
Type of item: Douglas swing frame
Serial number: __________________________________________________
Customer or operator (Town, Council, School, etc.):
______________________________________________________________
______________________________________________________________
Competent person in charge:
______________________________________________________________
______________________________________________________________
Installation Company (address):
______________________________________________________________
______________________________________________________________
Responsible assistant (assembler):
______________________________________________________________
______________________________________________________________
Received the complete assembly instructions, maintenance instructions and maintenance
printout.
______________________________________________________________
(Signature of operator)
(Signature of Installation Company)
(Stamp)
Date: ___________________
Содержание 4577-1-200
Страница 7: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 7...
Страница 8: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 8...
Страница 9: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 9...
Страница 13: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 13...
Страница 16: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 16...