Huck 4577-1-200 Скачать руководство пользователя страница 1

                                                        HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen 

                                                         [email protected] - www.huck.net 

 

 

 

1

              

 

                      Assembly Instructions 
                   Douglas Fir Swing Frame 
                         Art. 4577-1-200 

 

     Operator: ___________________________________________________  

 

     Location: ___________________________________________________  

 

 

                 

Содержание 4577-1-200

Страница 1: ...4 Asslar Berghausen seiltechnik huck net www huck net 1 Assembly Instructions Douglas Fir Swing Frame Art 4577 1 200 Operator ___________________________________________________ Location _____________...

Страница 2: ...sted in accordance with HIC critical drop height as tested 3 Name and overall dimension of the largest item of equipment 1 Wooden post Length 4 00 m 18 cm 50 kg 4 Weight of the heaviest item of equipm...

Страница 3: ...new play equipment standard EN 1176 Drawings Views All optical drawings are showing only the measurements dimensions and are no mandatory technical views of the complete item We reserve the right to c...

Страница 4: ...top nuts M16 4 cover caps for M16 Play equipment different play equipment therefore see package contents and freight documents Required devices 1 wood drilling machine 17 18 x 350mm Required assembly...

Страница 5: ...set the drillings on the cross beam To avoid that the wood tears out while drilling you should hold a board against it secure the cross beam with the 4 bolts M16 x 360 the washers the lock nuts and c...

Страница 6: ...ecting ends left and right side of the top beam it is possible to install an equipment like the pendulum seat swing seat rope ladder and other one point bearing equipment Attention You are only allowe...

Страница 7: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 7...

Страница 8: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 8...

Страница 9: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 9...

Страница 10: ...dation 16 Basic level mark If the playing surface is sand you have to make the top of foundation round as you see in the upper sketch if you let in the foundation 20 cm deep under the upper edge of th...

Страница 11: ...afety in the following cases General cracks through the cross beam of a swing or ropeway especially by torch growth and twisted growth If the wood center rots because it got wet on a non impregnated p...

Страница 12: ...etal components for damage and exchange if necessary 8 Check the surface quality of wooden parts for damage caused by weathering or other external factors and rectify exchanging if necessary It is rec...

Страница 13: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 13...

Страница 14: ...technik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 14 Maintenance Record Day of Equipment is Inspection Inspector s Name OK Useable Out of order Faults Faults rectifie...

Страница 15: ..._ ______________________________________________________________ Competent person in charge ______________________________________________________________ _____________________________________________...

Страница 16: ...HUCK Seiltechnik GmbH Dillerberg 3 35614 Asslar Berghausen seiltechnik huck net www huck net 16...

Отзывы: