HUCK Seiltechnik GmbH - Dillerberg 3
– 35614 Asslar-Berghausen
[email protected] - www.huck.net
\\CAD1\Standard\4591-50-9\Montageanleitung\Easy_Swing_Schaukelbett_4591_50_9_ST_B_L_1_GBR.doc
20
6 Examination after installation
If the equipment is not installed in a secure manner you must ensure
that access is closed to the public!
6.1
Marking the filling level ( +/- 0,00m )
Markings on the equipment to indicate filling levels of fall protection material
(for example of loose filling material).
6.2
In the following cases the equipment is not yet safely installed:
safe installation of the equipment is not fully completed
impact absorbing surface is not installed yet
the upkeep of occupational safety through appropriate maintenance can not
be guaranteed
6.3
Removing assembly accessories
Please make sure that all accessories, which were used for the installation of
the equipment, are removed from the play area! Only then the equipment can
be declared open.
6.4
Details concerning inspection of the equipment prior to the first use
No acceptance test specifications apply prior to first use.
6.5
Retighten bolts
Please retighten all bots after one week of initial use. Later, it is sufficient to re-
tighten the bolts upon respective maintenance.