background image

 

 

 

 

\\CAD1\Standard\5000-6-4\Montageanleitung\Spider_5000_6_4_ST_B_L_1_GBR.doc

 

- 23 - 

 

Remove Installment Ring Pos.14. 

 

 

 

Содержание 5000-6-4

Страница 1: ...ontageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 1 A Assembly Instructions Spider Art No 5000 6 4 Operator _____________________________________________________ Location ______________________________...

Страница 2: ...T_B_L_1_GBR doc Revision history Revision 0 2013 11 27 The first allowed version Assembly Instructions Revision 10 2020 06 25 Mindestraum nach Excel Tabelle ge ndert St ckliste Ringschraube mit Hebese...

Страница 3: ...ed Spaces Top view 14 5 Post installation checks 27 B Maintenance Instructions 27 6 Introduction Maintenance 28 7 General maintenance information 29 8 Maintenance timetable 31 9 Regular maintenance 32...

Страница 4: ...eiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 A lar Berghausen Tel 49 6443 83 11 0 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems during...

Страница 5: ...hange technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the properties and character...

Страница 6: ...eight as tested 3 Sand and gravel must be well rounded to remove most of the silty or clayey particles Washed sand or gravel is considered to be alluvial and free from silty or clayey particles With g...

Страница 7: ...ound with soil class 3 and 4 with big portion of stones portion 30 with bigger diameter of 63 mm grain size In case of sandy and soft soils the surface measure of foundations have to be enlarged for a...

Страница 8: ...360 mm 05 1 Eyebolt with lifting rope only for lifting the net will be removed later M16 06 1 Net Plate Post Connecter pre assembled on Pos 2 360 mm 07 1 Threaded bolt nut nyloc nut washer M16 x 165...

Страница 9: ...4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 01 1 Lg 7220 mm 193 7 x 6 3 mm 02 1 Ca 8200 x 8200 mm 03 2 400 x 400 mm...

Страница 10: ...10 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc Pos Quantity Symbol 06 1 360 mm pre assembled on Pos 2 07 1 M16 x 165 mm 08 4 M20 09 4 Lg 1250 mm 10 8 M12...

Страница 11: ...ageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 11 11 4 20 mm Lg 750 mm 12 1 500 x 500 mm 13 1 3 ml 14 64 Lg 1600 mm 12 mm provided by Customer 15 32 Lg 650 mm 12 mm provided by Customer 16 1 Lg 650 mm...

Страница 12: ...F Fall protection FGS Hook the catching rope with shackle pos 10 onto the chain pos 9 G Drainage layer KNR Middle foundation pipe On site customer Pos 16 Lg Length LRB The intermediate space fill the...

Страница 13: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 13 Loctite Thread locking adhesive Glue all screws nuts and sleeves with loctite not less than 5 drops except for Nylock nuts...

Страница 14: ...14 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 4 Required Spaces Top view...

Страница 15: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 15 Foundation plan Side view...

Страница 16: ...16 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc Foundation plan top view...

Страница 17: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 17...

Страница 18: ...18 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc Installing Pos 1...

Страница 19: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 19 Installing Pos 2 Raise net...

Страница 20: ...20 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc...

Страница 21: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 21 Net Alignment Net Tensioning Apply tension with 2 persons opposite from each other...

Страница 22: ...22 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc...

Страница 23: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 23 Remove Installment Ring Pos 14...

Страница 24: ...24 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc Install Pos 4 and Pos 7 using Pos 15 Loctite...

Страница 25: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 25...

Страница 26: ...26 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc...

Страница 27: ...is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure that all assembly...

Страница 28: ......

Страница 29: ...CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 27 B Maintenance Instructions Spider Art 5000 6 4...

Страница 30: ...ry repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your...

Страница 31: ...uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare pa...

Страница 32: ...ing screws 7 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 12 Claims liability for faults st...

Страница 33: ...f intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults that compromise safety In the event of a fault...

Страница 34: ...32 CAD1 Standard 5000 6 4 Montageanleitung Spider_5000_6_4_ST_B_L_1_GBR doc 9 Regular maintenance...

Страница 35: ...nger of rotting 10 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 10 9 Check the surface of plastic and metal part...

Страница 36: ...uipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equip...

Страница 37: ......

Страница 38: ...cation _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ Town T...

Страница 39: ......

Страница 40: ..._________________________________ ______________________________________________________________ Competent person in charge ______________________________________________________________ _____________...

Отзывы: