7  General maintenance information 

7.1 

Maintenance intervals 

Maintenance intervals are based on average use. Please note that more 
frequent inspections and/or maintenance are required if the play equipment is 
subject to intensive use. 

7.2 

Inspection frequency 

The frequency of inspections must be based on actual use. Factors that affect 
frequency include vandalism, location (e.g. coastal proximity), air pollution and 
the age of the equipment. 

7.3 

Maintenance products and procedures 

All nuts and bolts are hot-dip galvanised or stainless steel. One of the 
characteristics of stainless steel is that uncontrolled cold welding may occur 
when the nuts are tightened. To prevent this, it is necessary to spray the nuts 
and bolts with Teflon spray or another similar lubricant. 

7.4 

Spare parts 

All spare parts must conform to the manufacturer’s specifications. 

7.5 

Identifying spare parts 

All spare parts are listed in the parts list. The parts list follows the installation 
requirements. 

7.6 

Special instructions for the disposal of individual equipment 
components 

No special instructions are necessary. 

7.7 

Special measures during the break-in period 

No later than 2 weeks after assembly, all screwed connections should be 
checked and tightened if necessary. 

7.8 

Maintenance of protective surfaces 

Surfaces providing fall protection must also be maintained regularly. It is 
particularly important to maintain the correct level of loose surface material 
and add more if necessary. 

 

 

Содержание 4591-72

Страница 1: ...Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 1 A Assembly Instructions Slack Master Combination 2 Art 4591 72 Operator _____________________________________________________ Location ______________________________________________________ ...

Страница 2: ...bination_2_4591_72_ST_B_L_1_GBR doc Revision history Revision 0 2012 20 06 The first allowed version Revision 03 2020 04 28 Ansichten komplett überarbeitet PM neu Aufhängemaße FH Assembly instructions All rights reserved Copyright 2013 Huck Seiltechnik GmbH ...

Страница 3: ...4 Erection instructions 12 5 Post installation checks 19 B Maintenance Instructions Slack Master Combination 2 Art 4591 72 17 6 Introduction Maintenance 18 7 General maintenance information 19 8 Maintenance timetable 21 9 Regular maintenance 22 10 Monthly maintenance 23 11 Quarterly maintenance 23 12 Half yearly maintenance 24 13 Annual maintenance 24 14 Maintenance printout 26 15 Hand over docume...

Страница 4: ...Fa Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 Aßlar Berghausen Tel 49 6443 83 11 99 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems during installation or with any other questions You can reach us at the following Tel 49 6443 83 11 99 Following installation complete assembly instructions maintenance instructions and a maintena...

Страница 5: ... Other floor materials As recommended by manufacturer Critical drop height as tested Sand and gravel must be well rounded to remove most of the silty or clayey particles Washed sand or gravel is considered to be alluvial and free from silty or clayey particles With gravel this is generally described as pearl gravel Degree of non uniformity D60 D10 3 0 The grain size can be determined by using a si...

Страница 6: ... 30 with bigger diameter of 63 mm grain size In case of sandy and soft soils the surface measure of foundations have to be enlarged for about 50 8 Assembly time once foundations completed 3 hours Required assistants 2 persons 9 Possibly required spare parts can be obtained directly from your supplier or from the company Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 Aßlar ...

Страница 7: ...er cap red Ø 101 6 mm 03 6 Turnbuckle pre assembled on Pos 04 09 M12 04 1 Slackline AM 4240 mm 05 1 Bowline AM 3000 mm 06 1 Holding ring AM 3000 mm 07 1 Garland Rope AM 3000 mm 08 1 Hang loops AM 3000 mm 09 2 Balancing rope AM 3000 mm 10 4 HDPE plate with pipe clamp Ø 490 mm 11 18 Pipe clamp Ø 101 6 mm 12 12 Self drilling screw 4 5 x 25 mm 13 4 Pipe clamp as ground anchor Ø 101 6 mm 14 12 Carriage...

Страница 8: ...ung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 01 4 Lg 3400 mm Ø 101 6 mm 02 4 Ø 101 6 mm 03 6 M12 pre assembled on Pos 04 09 04 1 AM 4240 mm 05 1 AM 3000 mm ...

Страница 9: ...rd 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 9 Pos Quantity Symbol 06 1 AM 3000 mm 07 1 AM 3000 mm 08 1 AM 3000 mm 09 2 AM 3000 mm 10 4 Ø 490 mm 11 18 Ø 101 6 mm 12 12 4 5 x 25 mm ...

Страница 10: ...10 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc Pos Quantity Symbol 13 4 Ø 101 6 mm 14 12 M8 x 35 mm 15 12 M8 16 4 Ca 300 x 300 mm on site by customer ...

Страница 11: ...Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 11 Loctite Thread locking adhesive Glue all screws nuts and sleeves with loctite not less than 5 drops except for lock nuts ...

Страница 12: ...12 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 4 Erection instructions ...

Страница 13: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 13 ...

Страница 14: ...14 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...

Страница 15: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 15 ...

Страница 16: ...16 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...

Страница 17: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 ...

Страница 18: ...ions AB Minimum legal setting time AM Axial dimension D Concrete C25 30 for foundations Concrete requirement 1 54 m ER Ground fall protection etc ground 100 mm thick F Fall protection 300 mm G drainage layer 100 mm O K Upper edge of play level PS Space requirement including safety zone 38 15 m R Radius ...

Страница 19: ... equipment is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from the playing area The equipment must not be approved for use until this check has been carried out 5 4 Information about inspection of the equipment before it is u...

Страница 20: ......

Страница 21: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 B Maintenance Instructions Slack Master Combination 2 Art 4591 72 ...

Страница 22: ...s inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 Aßlar Berghausen Tel 49 6443 83 11 99 Fax 49 6443 83 11 79 This equipment should only be assembled maintained and repaired by persons with the necessary expertise A co...

Страница 23: ...l is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare parts must conform to the manufacturer s specifications 7 5 Identifying spare parts All spare parts are listed in the parts list The parts list follows the installation requirements 7 6 Special...

Страница 24: ...re no missing screws 7 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 12 Claims liability for faults steel poles Steel posts and footings are covered by our guarantee if refular maintenance is carried out and recorded in writing Our general terms and conditions apply Maintenance of steel pole...

Страница 25: ...he event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults that compromise safety In the event of a fault that compromises safety quick action must be taken This may involve repairing it immediately or shutting down and dismantling the equipment 8 1 4 Faults that compromise function Faults that...

Страница 26: ...22 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 9 Regular maintenance ...

Страница 27: ...d replace if necessary 10 6 Check rubber parts sleeves etc for wear and tear or damage and replace if necessary 10 7 If necessary remove excess padding material from the post footings due to danger of rotting 10 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 10 9 Check the surface of plastic and metal parts e g s...

Страница 28: ...intenance 13 Annual maintenance 13 1 Ascertaining that the equipment foundations and surfaces are safe for operation 13 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by someone with the necessary exper...

Страница 29: ......

Страница 30: ...________ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date of inspection Inspector O K Accessible Barriered Defects Repaired by Date Please copy and return once a year after main inspection has been carried out to the ...

Страница 31: ......

Страница 32: ...____________________________________________________ ______________________________________________________________ Competent person in charge ______________________________________________________________ ______________________________________________________________ Installation company address ______________________________________________________________ _______________________________________...

Отзывы: