Incremental Hollow Shaft Encoder FGHJ 5
FGHJ5_MANUAL-en_R4(2018-11-05)ID74524.docx
13
5
Installation and commissioning
5.1
Safety instructions
Personnel
Only trained, specialized personnel should perform installation and commissioning work.
Observe safety instructions of chapter 2 before starting any tasks (installation/testing).
5.2
Mounting of the encoder (mechanically)
Mounting and disassembly by means of a hammer or similar tools is not permitted (warranty void).
5.2.1
Assembly instruction for hollow shaft devices
1.
Mount the adapter flange and align precisely with dial gauge; if necessary optimize the
alignment with ball pressure adjusting screws.
2.
Secure the ball pressure screws with Loctite. Remove pressure screws that are not used, or
likewise secure them with a thread-lock lacquer.
Max. tightening torque for M12 approximately 25 Nm; for M16 approximately 35 Nm.
The hollow shafts have tapped holes on both sides at the front. For removal use screws to attach the
mounting sleeve, and the use a puller to draw off the unit. A suitable mounting sleeve is recommended
for each plant area (specify on ordering).
Mount hollow shaft encoders using mounting sleeve only.
NOTE!
The radial deviation of the shaft ( Fig. 2 Pos. 1) should not exceed 0,05 mm.
3.
Use feather keys in accordance with DIN 6885.
Abb. 2
Abb. 1