Hubert HUBM-2F Series Скачать руководство пользователя страница 8

8

Service, Installation and Care Manual

MAINTENANCE (CONTINUED)

SWING DOOR REPLACEMENT AND ADJUSTMENT 

1.  Visually inspect the exterior of the package and skid or container. Any damage should be noted and  

 

  reported to the delivering carrier immediately.

2.  If damaged, open and inspect the contents with the carrier.

3.  In the event that the exterior is not damaged, yet upon opening, there is concealed damage to the  

  equipment, notify the carrier. Notification should be made verbally as well as in  

  written form.

4.  Request an inspection by the shipping company of the damaged equipment. This should be done within    

  10 days from receipt of the equipment.

5.  Be certain to check the compressor compartment housing and visually inspect the refrigeration package.   

  Be sure lines are secure and base is still intact.

REMOVE THE BOTTOM PANEL

Loosen and remove the top screws, slide the panel up and out. 

LIGHT BULB REPLACEMENT

1.  Upper light bulb replacement: Loosen the screws in the bottom of the top panel and swing the panel up    

  until the light bulb is exposed.  Light bulb can then be changed.

2.  LED light bulb replacement: Take the cover off to replace the LED light bulb.

Содержание HUBM-2F Series

Страница 1: ...ion and Care Manual Please read this manual completely before attempting to install or operate this equipment Notify carrier of damage Inspect all components immediately See page 2 IMPORTANT INFORMATI...

Страница 2: ...care should be taken during unloading so the equipment is not damaged while being moved into the building 1 Visually inspect the exterior of the package and skid or container Any damage should be not...

Страница 3: ...B HUBM 2R Refrigerator 120 60 1 1 5A 2 4 Cu Ft 67 96 L 1 16 495 3 5 Oz 0 09 Kg 95 lb 5 15P HUBM 2FB HUBM 2F Freezer 120 60 1 2 0A 1 7 Cu Ft 48 13 L 1 16 341 6 oz 0 17 Kg 95 lb 5 15P HUBM 3 5RB HUBM 3...

Страница 4: ...2 from any wall with at least 12 of clear space above the unit LEVELING A level cabinet looks better and will perform better because the doors will line up with the frames properly Use a level to make...

Страница 5: ...y setting of the temperature range is 35 to 41 F FREEZERS 1 Anti Condensation heaters on the door frames work in conjunction with the compressor 2 The factory setting of the temperature range is 3 to...

Страница 6: ...wn through with compressed air Failure to maintain a clean condenser coil can initially cause high temperatures and excessive run times Continuous operation with dirty or clogged condenser coils can r...

Страница 7: ...rength cleaning products on gaskets as this can cause them to become brittle and prevent proper seals Do not use sharp tools or knives to scrape or clean the gasket which could possibly tear the gaske...

Страница 8: ...as well as in written form 4 Request an inspection by the shipping company of the damaged equipment This should be done within 10 days from receipt of the equipment 5 Be certain to check the compresso...

Страница 9: ...9 Service Installation and Care Manual WIRING DIAGRAM HUBM 2RB HUBM 2R HUBM 2FB HUBM 2F...

Страница 10: ...10 Service Installation and Care Manual WIRING DIAGRAM HUBM 3 5RB HUBM 3 5R HUBM 3 5FB HUBM 3 5F...

Страница 11: ...11 Service Installation and Care Manual NOTES...

Страница 12: ...800 543 7374 www hubert com...

Отзывы: