OPERATION MANUAL
V2.4.0en/08.12.20//17.12
CC®-Immersion circulator
7
Table of contents
V2.4.0en/08.12.20//17.12
Details on the declaration of conformity ....................................................... 12
Responsible bodies and operators – Obligations and requirements............... 14
Proper disposal of resources and consumables ......................................... 15
Lifting and transporting the temperature control unit ................................... 18
Temperature control unit with lifting eyes ................................................ 18
Temperature control unit without lifting eyes ........................................... 19
Positioning the temperature control unit ....................................................... 20
Temperature control unit with casters ...................................................... 20
Temperature control unit without casters ................................................. 20
Recommended temperature control and cooling water hoses ...................... 23
Temperature control units with cooler ......................................................... 24
Temperature control unit with batch ............................................................ 25
Unscrewing/activating the leveling feet (if any) ............................................. 25
Externally closed and externally open applications ........................................ 25
Connecting externally closed application ...................................................... 26
Connecting an externally closed application .................................................. 26
Содержание CC-1 Series
Страница 1: ...CC Immersion Circulator...
Страница 2: ......
Страница 3: ...OPERATION MANUAL CC Immersion Circulator...
Страница 4: ......
Страница 6: ...OPERATION MANUAL CC Immersion circulator V2 4 0en 08 12 20 17 12 6 Pilot ONE Layout of the Home screen...
Страница 73: ...Annex Chapter 9 OPERATION MANUAL V2 4 0en 08 12 20 17 12 CC Immersion circulator 73 9 Annex...