HUBER+SUHNER MASTERLINE Ultimate Скачать руководство пользователя страница 6

INSTALLATION MANUAL 

MASTERLINE Ultimate Power 

Page 6 of 11 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 

accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 

HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 

general handling of these products please contact HUBER+SUHNER. 

 

Step 11  

Connect power jumper of connector head. 
The 6 power connector sockets are marked with the  numbers 
1L to 3L on the left side and 1R to 3R of the ride side starting 
at the top of the housing. 

 
Switch  off  the  power  supply  before  you  mate  or 
un-mate  the  power  connector.  Otherwise  the 
contacts  will  get  damaged.  Connector  is  not  for 
hot plugging. 

 
Mating: 
Remove protection caps of the plug.  Twist (120°) the coupling 
ring of the plug connector to remove protecting cap as shown. 
Note the lock / unlock symbol on the coupling ring. 
Remove  protection  caps  of  the  socket  on  the  MLUP.  Twist 
(120°)  the  coupling  ring  of  the  socket connector  anticlockwise 
to remove protecting cap as shown. 
Connect the two protection caps together for later reuse. 
 

Push plug connector slightly and in-line into socket connector, 
rotate  to  find  keying  position,  twist  coupling  ring  of  the  plug 
connector clockwise as shown until you hear and feel a “click”. 
Align white strip on the plug with the white strip on the socket 
to find keying position easier. 

 

Make  sure  the  plug  connector  is  in-line  with  the 
socket connector before coupling ring is twisted. 
Otherwise the connector might be damaged. 
Avoid  any  tilt  during  mating  process  since  the 
connector might be damaged 

 
Un-mating: 
Twist coupling ring anticlockwise as shown to un-mate the plug 
connector. Note the lock / unlock symbol. Mount the protection 
cap to avoid ingress of water or dirt.  
 
 

 

 

 

 

 

 

 

 
 
 

 

 

1L 

2L 

3L 

1R 

2R 

3R 

Содержание MASTERLINE Ultimate

Страница 1: ...lectrician National laws and regulations must be observed during installation The housing and the components used must be checked for exterior damage prior to installation If the cabling system is def...

Страница 2: ...roducts For advice concerning the general handling of these products please contact HUBER SUHNER RRH END OF ASSEMBLY Step 1 Use a smartphone to scan the QR code on the side of the reel The QR code pro...

Страница 3: ...y be fore attaching the MLUP connector head to the mounting bracket Step 4 Use a rope to pull up the cable system Check the maximum pulling force at 50 C ambient temperature for 1 hour as specified on...

Страница 4: ...r all cable clamps are mounted Step 6 Secure the MLUP connector head on the mounting bracket by tightening the two M6 screws on the bottom left and top right corner Tighten the M6 screws using a torqu...

Страница 5: ...to an earth bar with a grounding assembly with minimum 16 mm2 6 AWG cross section Consider the correct order first the grounding wire lug secondly the washer thirdly the spring washer Tighten the M8 e...

Страница 6: ...plugging Mating Remove protection caps of the plug Twist 120 the coupling ring of the plug connector to remove protecting cap as shown Note the lock unlock symbol on the coupling ring Remove protecti...

Страница 7: ...concerning the general handling of these products please contact HUBER SUHNER Step 12 Ensure smooth routing of all cables from connector head to RRH equipment using HUBER SUHNER cable clamps which are...

Страница 8: ...BASE STATION END OF ASSEMBLY Step 1 Unwind the whole assembly from the reel and lay the cable to the end equipment Use the pulling eye to feed the power cable through a conduit Step 2 Remove gland nut...

Страница 9: ...Any installation performed by unqualified personnel voids the product warranty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products...

Страница 10: ...wer jumper 2 core cable BTS end Multi core power cable conductor color code conductor numbering color code Option 1 Europe Option 2 USA Option 3 USA Option 1 Europe Option 2 USA 1L Brown Black Black 1...

Страница 11: ...nel voids the product warranty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products For advice concerning the general handling of th...

Отзывы: