Hubbell Lighting, Inc. Doc. No. 93062486
A subsidiary of Hubbell Incorporated Revision A
701 Millennium Drive • Greenville, SC 29607 Phone (864) 678-1000
Industrial Lighting
®
PAGE 3
FIGURE 7
FIGURA 7
FIGURE 9
FIGURA 9
5/16 MNTG SCREW (J)
INTO RAIL SLIDE NUT (K)
TORQUE: 120 IN-LB
HHH (MODULAR HIGHBAY)
INSTALLATION INSTRUCTIONS
SEE WARNINGS ON CARTON
WARNINGS:
Observe all precautions usually followed when dealing with high
voltage equipment when installing or servicing this light fixture.
Disconnect power before installing or servicing.
The product must be installed in accordance with the applicable
installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Protect all wiring connections with approved insulators rated
600V. 150
O
C.
Line voltage must be 120V – 277V to match Fixture voltage
requirement.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Upon receipt of this Fixture, thoroughly inspect it for any damage.
If any is found, the carrier should be notified and held
accountable.
INSTALLING AIRCRAFT CABLE MOUNTING SYSTEM
(See Figure 7 and 8):
WARNING! NOTICE AIRCRAFT CABLE KIT TYPE SHIPPED
WITH YOUR ORDER:
2mm KIT FOR LOWBAY SERIES ONLY!
3mm KIT FOR HIGHBAY SERIES ONLY!
1.
Install AC Mounting Bracket (R) onto each corner of the rail, inset
approximately 1-inch from the rail end. Using 5/16” Screw (J)
provided in the hardware kit, insert the screw through the bottom
hole of each backet and install into the Slide Nut (K) pre-installed
within the rail. Ensure the bracket when pre-tightened is vertically
oriented as shown in Figure 8.
2.
Tighten AC Mounting Bracket Screw (J) to torque noted in Fig. 8,
while supporting the bracket orientation to prevent rotating during
the tightening sequence.
3.
Insert each Snap Hook Eyelet of the Y-Cable Ass’y onto the AC
Mounting Bracket top holes on each end of the fixture so that the
cable spans across the lightbar as shown in Figure 7.
4.
The Top Cable of the Aircraft System is lopped around a facility
structural member suitable to support the fixture load. The bare
cable end being inserted into the Top Cable Loop and then
proceeding into the Gripper. The Top Cable length should be
adjusted to desired length according to mounting height selected).
5.
Repeat for other side of the fixture cable mounting.
6.
Final adjustment of the Gripper Barrel position across the width of
the fixture will balance the fixture, while Top Cable Length
adjustment will balance the fixture lengthwise. See Figure 7
illustration.
7.
Install lens option onto each Lightbar, see Figure 9. If wireguard
was ordered, lenses will ship installed on fixture.
8.
Complete electrical connection by installing AC Input Cord into
AC Panel as shown in Figure 10.
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 8
FIGURA 8
ACRYLIC LENS: SNAP INTO
LIGHTBAR GROOVE
AIRCRAFT
MNTG OPTION
BRACKET (R)
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 10
FIGURA 10
INSTALLING AIRCRAFT CABLE MOUNTING SYSTEM (See Figure 7 and 8):
WARNING! NOTICE AIRCRAFT CABLE KIT TYPE SHIPPED
WITH YOUR ORDER:
2mm KIT FOR LOWBAY SERIES ONLY!
3mm KIT FOR HIGHBAY SERIES ONLY!
1. Install AC Mounting Bracket (R) onto each corner of the rail, inset approximately 1-inch from the rail end. Using 5/16” Screw
(J) provided in the hardware kit, insert the screw through the bottom hole of each backet and install into the Slide Nut (K)
pre-installed within the rail. Ensure the bracket when pre-tightened is vertically oriented as shown in Figure 8.
2. Tighten AC Mounting Bracket Screw (J) to torque noted in Fig. 8, while supporting the bracket orientation to prevent rotating
during the tightening sequence.
3. Insert each Snap Hook Eyelet of the Y-Cable Ass’y onto the AC Mounting Bracket top holes on each end of the fixture so that
the cable spans across the lightbar as shown in Figure 7.
4. The Top Cable of the Aircraft System is lopped around a facility structural member suitable to support the fixture load. The
bare cable end being inserted into the Top Cable Loop and then proceeding into the Gripper. The Top Cable length should be
adjusted to desired length according to mounting height selected).
5. Repeat for other side of the fixture cable mounting.
6. Final adjustment of the Gripper Barrel position across the width of the fixture will balance the fixture, while Top Cable Length
adjustment will balance the fixture lengthwise. See Figure 7 illustration.
7. Install lens option onto each Lightbar, see Figure 9. If wireguard was ordered, lenses will ship installed on fixture.
8. Complete electrical connection by installing AC Input Cord into AC Panel as shown in Figure 10.
INSTALLATION INSTRUCTIONS
Hubbell Lighting, Inc. Doc. No. 93062486
A subsidiary of Hubbell Incorporated Revision A
701 Millennium Drive • Greenville, SC 29607 Phone (864) 678-1000
Industrial Lighting
®
PAGE 3
FIGURE 7
FIGURA 7
FIGURE 9
FIGURA 9
5/16 MNTG SCREW (J)
INTO RAIL SLIDE NUT (K)
TORQUE: 120 IN-LB
HHH (MODULAR HIGHBAY)
INSTALLATION INSTRUCTIONS
SEE WARNINGS ON CARTON
WARNINGS:
Observe all precautions usually followed when dealing with high
voltage equipment when installing or servicing this light fixture.
Disconnect power before installing or servicing.
The product must be installed in accordance with the applicable
installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Protect all wiring connections with approved insulators rated
600V. 150
O
C.
Line voltage must be 120V – 277V to match Fixture voltage
requirement.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Upon receipt of this Fixture, thoroughly inspect it for any damage.
If any is found, the carrier should be notified and held
accountable.
INSTALLING AIRCRAFT CABLE MOUNTING SYSTEM
(See Figure 7 and 8):
WARNING! NOTICE AIRCRAFT CABLE KIT TYPE SHIPPED
WITH YOUR ORDER:
2mm KIT FOR LOWBAY SERIES ONLY!
3mm KIT FOR HIGHBAY SERIES ONLY!
1.
Install AC Mounting Bracket (R) onto each corner of the rail, inset
approximately 1-inch from the rail end. Using 5/16” Screw (J)
provided in the hardware kit, insert the screw through the bottom
hole of each backet and install into the Slide Nut (K) pre-installed
within the rail. Ensure the bracket when pre-tightened is vertically
oriented as shown in Figure 8.
2.
Tighten AC Mounting Bracket Screw (J) to torque noted in Fig. 8,
while supporting the bracket orientation to prevent rotating during
the tightening sequence.
3.
Insert each Snap Hook Eyelet of the Y-Cable Ass’y onto the AC
Mounting Bracket top holes on each end of the fixture so that the
cable spans across the lightbar as shown in Figure 7.
4.
The Top Cable of the Aircraft System is lopped around a facility
structural member suitable to support the fixture load. The bare
cable end being inserted into the Top Cable Loop and then
proceeding into the Gripper. The Top Cable length should be
adjusted to desired length according to mounting height selected).
5.
Repeat for other side of the fixture cable mounting.
6.
Final adjustment of the Gripper Barrel position across the width of
the fixture will balance the fixture, while Top Cable Length
adjustment will balance the fixture lengthwise. See Figure 7
illustration.
7.
Install lens option onto each Lightbar, see Figure 9. If wireguard
was ordered, lenses will ship installed on fixture.
8.
Complete electrical connection by installing AC Input Cord into
AC Panel as shown in Figure 10.
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 8
FIGURA 8
ACRYLIC LENS: SNAP INTO
LIGHTBAR GROOVE
AIRCRAFT
MNTG OPTION
BRACKET (R)
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 10
FIGURA 10
Hubbell Lighting, Inc. Doc. No. 93062486
A subsidiary of Hubbell Incorporated Revision A
701 Millennium Drive • Greenville, SC 29607 Phone (864) 678-1000
Industrial Lighting
®
PAGE 3
FIGURE 7
FIGURA 7
FIGURE 9
FIGURA 9
5/16 MNTG SCREW (J)
INTO RAIL SLIDE NUT (K)
TORQUE: 120 IN-LB
HHH (MODULAR HIGHBAY)
INSTALLATION INSTRUCTIONS
SEE WARNINGS ON CARTON
WARNINGS:
Observe all precautions usually followed when dealing with high
voltage equipment when installing or servicing this light fixture.
Disconnect power before installing or servicing.
The product must be installed in accordance with the applicable
installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Protect all wiring connections with approved insulators rated
600V. 150
O
C.
Line voltage must be 120V – 277V to match Fixture voltage
requirement.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Upon receipt of this Fixture, thoroughly inspect it for any damage.
If any is found, the carrier should be notified and held
accountable.
INSTALLING AIRCRAFT CABLE MOUNTING SYSTEM
(See Figure 7 and 8):
WARNING! NOTICE AIRCRAFT CABLE KIT TYPE SHIPPED
WITH YOUR ORDER:
2mm KIT FOR LOWBAY SERIES ONLY!
3mm KIT FOR HIGHBAY SERIES ONLY!
1.
Install AC Mounting Bracket (R) onto each corner of the rail, inset
approximately 1-inch from the rail end. Using 5/16” Screw (J)
provided in the hardware kit, insert the screw through the bottom
hole of each backet and install into the Slide Nut (K) pre-installed
within the rail. Ensure the bracket when pre-tightened is vertically
oriented as shown in Figure 8.
2.
Tighten AC Mounting Bracket Screw (J) to torque noted in Fig. 8,
while supporting the bracket orientation to prevent rotating during
the tightening sequence.
3.
Insert each Snap Hook Eyelet of the Y-Cable Ass’y onto the AC
Mounting Bracket top holes on each end of the fixture so that the
cable spans across the lightbar as shown in Figure 7.
4.
The Top Cable of the Aircraft System is lopped around a facility
structural member suitable to support the fixture load. The bare
cable end being inserted into the Top Cable Loop and then
proceeding into the Gripper. The Top Cable length should be
adjusted to desired length according to mounting height selected).
5.
Repeat for other side of the fixture cable mounting.
6.
Final adjustment of the Gripper Barrel position across the width of
the fixture will balance the fixture, while Top Cable Length
adjustment will balance the fixture lengthwise. See Figure 7
illustration.
7.
Install lens option onto each Lightbar, see Figure 9. If wireguard
was ordered, lenses will ship installed on fixture.
8.
Complete electrical connection by installing AC Input Cord into
AC Panel as shown in Figure 10.
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 8
FIGURA 8
ACRYLIC LENS: SNAP INTO
LIGHTBAR GROOVE
AIRCRAFT
MNTG OPTION
BRACKET (R)
AIRCRAFT CABLE KIT
( 2mm KIT FOR LB, 3mm KIT FOR HB)
FIGURE 10
FIGURA 10