Pub. 42004-790B
SP2 Fiber Class I Div. 2 Handset/Speaker Amplifier Station
Page 12 of 24
P:\Standard IOMs - Current Release\42004 Instr. Manuals\42004-790B.docx
10/20
Figure 9. SP2 Main PCBA (Fiber)
Fiber Termination Board
The fiber termination PCBA is mounted on top of the main PCBA(see Figure 3). Exact fiber termination
is installation dependent because the fiber optic cable and SFP (Small Form-factor Pluggable)
transceivers used in SP2 system installations are customer supplied. Here are the basic steps for
terminating the fiber optic cable to the SP2 station:
1.
Insert the SFP transceiver into the SFP receptacle (see Figure 10 and Figure 11).
2.
Route the terminated fiber with appropriate connectors into the station and over to the fiber
termination PCBA.
3.
Wrap the fiber cable around the excess fiber spool.
4.
Plug the fiber connector into the SFP (see Figure 11).
Figure 10. Fiber Termination PCBA