Hubbel Chance BP3 Скачать руководство пользователя страница 10

10 of 12

P805-0011 Rev. A

©

2002 Hubbell Power Systems, Inc., 210 North Allen Street, Centralia, MO 65240 U.S.A.

Operation

!

 

 WARNING

High Voltage Electric Arc Hazard.

Opening an energized disconnect switch without a loadbreak tool will
create an electrical arc.

Can cause death, severe personal injury or property damage.

Use appropriately rated loadbreak tool to open an energized by-pass
switch.

!

 

 WARNING

High Voltage Electric Arc Hazard.

By-passing a voltage regulator without first setting the regulator to its
neutral position and without using a loadbreak tool to open the re-
maining disconnect blade will create an electrical arc.

Can cause death, severe personal injury or property damage.

Set regulator to its neutral position and use appropriately rated
loadbreak tool to open the remaining disconnect blade to by-pass a
voltage regulator.

• Standard BP3 switches have blade

guides on the left and right disconnect
blades. Open only after by-pass blade
has been closed electrically paralleling
the disconnect blades.

• The loadbreak hook option equips the

disconnect blades with single sided
loadbreak hooks. The loadbreak hooks
allow the use of a loadbreak tool for the
switching of load, capacitor, line/cable
charging and magnetizing currents.

• To open loadbreak hook equipped

disconnect or by-pass blades of an
energized by-pass disconnect switch,
use only an approved loadbreak tool
designed for use with switches.

• Follow the instructions provided with such

tools.

• When by-passing a voltage regulator,

except three-phase induction
regulator

, follow the steps outlined

below. For three-phase induction
regulators, contact supervisor or factory
representative.

1. Set voltage regulator automatic control to manual. Set voltage regulator to its neutral position. By-

pass blade is open. Disconnect blades are closed.

4. Open remaining disconnect blade using loadbreak tool to interrupt the voltage regulator

magnetizing current. By-pass blade is closed. Disconnect blades are open.

5. Reverse the above sequence of steps to return a voltage regulator to service.

2. Close by-pass blade. The by-pass blade shunts the voltage regulator series winding. Disconnect

blades are closed.

3. Open either disconnect blade to disconnect the voltage regulator series winding. By-pass blade is

closed. Voltage regulator shunt winding remains energized through other disconnect blade.

Содержание Chance BP3

Страница 1: ...pe BP3 3 Pull By Pass Switch for Distribution Switching HUBBELL POWER SYSTEMS INC 210 North Allen Street Centralia MO 65240 1395 U S A Telephone 573 682 5521 IMPORTANT Keep this manual readily availab...

Страница 2: ...with established safety practices c trained in the proper care and use of protective equipment such as rubber gloves hard hat safety glasses or face shields flash clothing etc in accordance with estab...

Страница 3: ...ified for capacities other than what was shipped with the units If a different capacity is desired contact your supervisor or factory representative to se cure the appropriate unit Overview Function T...

Страница 4: ...ing without the use of a back strap or pole mounting bracket The structure must be drilled to match the base mounting holes or slots The user supplies the mounting hard ware 3 Terminal Connectors 3 va...

Страница 5: ...ch base Leave switch on its pallet until ready to install Compare switch with the photo to be sure all items have been included Contact your factory representative if any parts are missing If desired...

Страница 6: ...vided back strap and appropriate length bolts Adjust the bolts in the switch base and back strap slots to fit close to the vertical structure Torque mounting hardware nuts to 60 ft lb Leave bolt head...

Страница 7: ...onductors will be secured Wire brush conductor surfaces Apply a contact sealing paste to the cleaned surfaces A B Chance Z L N or equivalent Assemble connectors conductors and hardware to the switch t...

Страница 8: ...rmal Operating Position By Pass Operating Position Recloser Recloser By Pass Switch By Pass Blade Source Load Disconnect Blade Disconnect Blade Recloser Recloser By Pass Switch By Pass Blade Source Lo...

Страница 9: ...ead and look away from the switch Quickly firmly and without hesitation pull down and towards the hinge end of the switch at about a 45 angle Figure 8 Once the switch is open complete the blade travel...

Страница 10: ...single sided loadbreak hooks The loadbreak hooks allow the use of a loadbreak tool for the switching of load capacitor line cable charging and magnetizing currents To open loadbreak hook equipped disc...

Страница 11: ...enance check at least once a year more frequently if located in a contaminated area For additional recommendations refer to ANSI C37 35 IEEE Guide for the Applica tion Installation Operation And Maint...

Страница 12: ...12 of 12 P805 0011 Rev A 2002 Hubbell Power Systems Inc 210 North Allen Street Centralia MO 65240 U S A Notes Records...

Отзывы: