Hubbard Systems Scotsman MF Скачать руководство пользователя страница 2

 

Installation Guide for Scotsman Flaker 

Unpacking 

 

Remove the two banding strips securing equipment to pallet. 

 

Remove cardboard carton and packaging material. 

 

Inspect exterior of machine for any potential damage. 

 

Remove Front, Left & Right hand panels & release machine from the pallet 

Remove from inside the machine: 

 

1 x water inlet tube   

 

1 x drain tube complete with clip 

If a separate Storage bin is supplied 

– Unpack as suggested above, then open the 

bin door and remove: 

 

1 x drain tube kit (complete with clip) 

 

1 x drain fitting (may be supplied separately !!) 

 

1 x Unit leg kit  

 

Installation 

Storage Bin: 

Fix ‘Legs’ onto the base of the Storage bin 

If required, install the drain fitting to the base of the storage bin (using PTFE tape 
also) Secure correctly, the drain hose to the drain fitting using the clip supplied 

Stand the storage bin upright and level the bin using the ‘adjustable legs’ as 
appropriate 

Check that the bin has the foam strip installed all around the top edge 

Ice Machine Production Head: 

Mount the machine onto the top of the Storage bin locate so to ensure the ‘Ice drop’ 
area of the unit is correctly placed. Secure the machine to the Storage bin !! 

Again, check that the assembly is level. Adjust legs as required. 

  

 

 

Отзывы: