3
response speed is fast.
3 The 10.4-inch large true color touch screen makes it easy to use.
4 High level tracking accuracy.
5 Fully automatic distillation process, full automatic process monitoring.
IV.Operating procedures
1. After unpacking the instrument, please check the accessories according to the packing list. If it
is damaged, please contact our company in time.
2. The instrument should be carried vertically. The inclination angle should not be greater than 30
degrees along the height of the instrument. It should be installed in a place with good ventilation
and light, and the distance from the wall should be more than 0.2 meters. The installation should
be stable, otherwise the vibration and noise will increase.
3. Check the antifreeze. The antifreeze has been added at the factory.
4. Connect the power supply of the instrument to a socket with a capacity of 220V / 15A or more.
Be sure to have a good ground wire.
5. Take a 100ml sample from a graduated cylinder, and pour as much as possible of the sample
from the graduated cylinder into the distillation flask, taking care that no liquid can flow into the
branch tube of the distillation flask.
6. Insert the temperature sensor for measuring steam vertically into the distillation flask. The
lowest end of the sensor should be 10mm lower than the highest point on the bottom of the
inner wall of the branch tube of the distillation flask.
7. Extend the branch tube of the distillation flask into the condensing tube 25 mm to 50 mm so that
the rubber stopper on the branch tube is tightly connected to the condensing tube. Rotate the
knob of the lifting rack to adjust the height of the electric furnace, and adjust the quartz glass
partition to align the electric furnace with the center of the bottom of the distillation flask.
8. Hang the drainage piece on the wall of the measuring cylinder, then place the measuring
cylinder in the recovery chamber, rotate the measuring cylinder so that the drainage piece is not
on the optical path of the initial distillation point detection, and close the door of the recovery
chamber.
9. Check that all parts are ready, turn on the main power of the instrument, and follow the steps on