Verifying the Installation
UPS5000-H-400 kVA & 800 kVA-NTN Quick Guide (Singapore 1-NET, 100 kVA Power Modules)
Installing Rectifiers and Cables (800 kVA)
Different power sources
Single power source
1. Check that there is no foreign matter in the cabinets.
2. (Remove the paper protective film from the sealing putty.) After routing cables and verifying cable connections, seal the gap between cables and the cabinet using sealing putty.
3. After verifying the installation, reinstall all the covers.
4. Do not remove the dustproof cover before power-on to prevent dust from entering the UPS.
•
Cables have been preinstalled and bound in the inductor cabinet.
•
The number and colors of cables in the figures are for reference only.
•
Do not bind signal cables and power cables together.
Signal cable hole
Power cable hole
Signal cable route
Signal cable route
Signal cable
routing from the
inductor cabinet to
the UPS cabinet
Equipotential
ground point