Reserve a clearance of at least 950 mm from the front of the cabinet for
ventilation and operations.
●
Reserve a clearance of at least 500 mm from the top of the cabinet for
operations.
●
Reserve a clearance of at least 500 mm from the rear of the cabinet for
ventilation.
●
Reserve a clearance of at least 800 mm if you need to perform operations at
the rear of the cabinet.
6.1.3 Tools and Instruments
NO TICE
● Use insulated tools to avoid electric shocks.
● The following table lists only the common tools for installation and cable
connection. For more dedicated tools required, see the document for each
component. Prepare tools based on site requirements.
Table 6-1 Tools and instruments
Tools and Instruments
Electric forklift
Manual forklift
Step ladder
Rubber mallet
Hammer drill (with a
Φ16 drill bit)
Hand-held electric drill
Hole saw
Heat gun
Diagonal pliers
Crimping tool
Wire strippers
Electro-hydraulic
pliers
UPS5000-H-(400 kVA-800 kVA)