UPS5000-E-(25 kVA-75 kVA)-BF
User Manual
3 Installation
Issue 07 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
51
Table 3-8
Recommended upstream input and downstream output circuit breakers
Model
UPS
Capacity
Component
Specifications
Manufacturer
UPS5000-E-7
5K-BF
25 kVA
Input circuit
breaker
T1N160 TMD
R63 FFC 3P
ABB
(recommended
when the
short-circuit
current where
the switch is
located is less
than 6 kVA.)
50 kVA
Input circuit
breaker
T1N160 TMD
R100 FFC 3P
75 kVA
Input circuit
breaker
T1N160 TMD
R160 FFC 3P
The input upstream circuit breakers recommended in
If multiple loads are connected, specifications for branch circuit breakers must not exceed the
recommended specifications.
The circuit breaker selection principle is to protect loads and cables, and the cascading principle is to
realize specific protection.
3.1.4 Unpacking and Checking
Context
Only trained personnel are allowed to move the UPS. Use a pallet truck to transport the
UPS box secured to a wooden support to the installation position.
Visually inspect the UPS appearance for shipping damage. If it is damaged, notify the
carrier immediately.
To prevent the UPS from falling over, secure it to a pallet truck using ropes before moving
it.
To prevent shocks or falls, move the UPS gently. After placing the UPS in the installation
position, unpack it and take care to prevent scratches. Keep the UPS steady during
unpacking.
Check that the fittings comply with the packing list. If some fittings are missing or do not
comply with the packing list, record the information and contact your local Huawei office
immediately.
If the UPS installation environment is in poor condition and the UPS will be stored for a
long time after it is unpacked, wrap the UPS with the original plastic coat to prevent dust.
Procedure
Step 1
Use a pallet truck to transport the UPS to the installation position.
Step 2
Remove the UPS outer packing.