3 Installation
Issue 07 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
29
Adjustable guide rails are optional. You are advised to use adjustable guide rails if the UPS is rack-
mounted. If a 2 U device is to be installed, use M6x16 screws to secure the adjustable guide rails. If a 3
U device is to be installed, use two floating nuts and M6x16 screws to secure the adjustable guide rails.
The floating nuts are delivered with the UPS.
Step 3
Install mounting ears and devices from bottom up, as shown in the following figure.
(1) LCD
(2) UPS
(3) Battery pack
Step 4
Connect cables. For details, refer to the section "Connecting Cables."
----End
3.2.2 Routing Cables
Determine the installation positions and route cables. The UPS can be tower-mounted or rack-
mounted. A maximum of four battery packs can be configured. Place the battery packs
together based on site requirements. If the UPS is tower-mounted, place the battery packs on
the left or right of the UPS. If the UPS is rack-mounted, place the battery packs over or under
the UPS. This section describes how to route cables for two battery packs and is for reference
only.
and
respectively show the cable routes for a tower-mounted UPS
and a rack-mounted UPS.