Figure 3-3 Different voltages
3.1 Unpacking and Checking
After a battery box is delivered onsite, unpack it and check that:
●
If any damage is found on the battery box appearance, contact the carrier
immediately.
●
Check that the battery box barcode (on the rear of the box, near the wiring
port) is consistent with that specified in the order. If not, contact the local
Huawei office immediately.
●
Do not transport the equipment by holding the front panel or wiring port
covers.
●
Do not wear rings, watches, or other metal objects when moving the battery
box.
3.2 Installation Preparations
NO TICE
Get tools insulated to prevent electric shocks.
Table 3-1 Installation tools
Name, Specifications, and Appearance
Multimeter
Phillips screwdriver
(PH2 x 150 mm,
PH3 x 250 mm)
Flat-head
screwdriver (2
mm x 80 mm)
Torque
screwdriver
Wire stripper
Insulation tape
Cotton cloth
Heat-shrink
tubing
UPS2000-A-(1 kVA–3 kVA) Battery Box
Quick Guide
3 Installation Procedure
Issue 05 (2022-05-23) Copyright © Huawei Digital Power Technologies Co., Ltd.
8