TP48200A-DT19C1 & DT19C2 & HT19C1 & HT19C2
Installation Guide
7 Installing Cables
Issue 03 (2014-02-23)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64
Figure 7-7
Installing DC output power cables
(1) Load
----End
7.4 Installing AC Input Power Cables
If an AC meter and a current transformer are configured, route the AC input power cables through
the current transformer first and then connect them to the AC input circuit breaker. If a 110 V AC
dual-live wire (L1 and L2) input power grid is met in this case, after installing the AC input power
cables, you need to change the cable connection for the AC meter.